ELE19-04502
| Electrical Rough-In | 4/14/2020 | 4/14/2020 | 4/14/2020 1:45:41 PM | P | PASS |
|
|
PT deck L2 pour2 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Pour covers south side of level 2 and ramp to level 3, rough in ok cover
|
ELE19-04799
| Electrical Rough-In | 4/13/2020 | 4/14/2020 | 4/14/2020 1:09:37 PM | P | PASS |
|
|
Elevated deck rough in 4th floor northwest corner Phone #: ###-#### Inspection requested via web by Jason Parke Pour noted rough in ok cover.
|
ELE20-00179
| Electrical Rough-In | 4/14/2020 | 4/14/2020 | 4/14/2020 11:33:33 AM | P | PASS |
|
|
John ###-#### Basement rough in ok cover.
|
ELE20-00179
| Conference | 4/14/2020 | 4/14/2020 | 4/14/2020 11:13:26 AM | P | PASS |
|
|
Discussed what areas of band shell stage area are damp locations and wet locations. As per 406.9 (A) and (B) for 15 and 20 amp, 125 to 250 volt receptacles, the first 12' from the front of overhang shall be considered a wet location subject to beating rain, remaining area beyond 12' back from the front of overhang shall be considered a damp location. 406.9 (B)(2)(b) shall apply to other ampacities due to a band member would not leave their equipment unattended. Determinations made with Daryl Degrange Chief Electrical Inspector and John with AME Electric on site.
|