PLM96-00848
| INSP - Ground work | 4/12/1996 | 4/15/1996 | 4/15/1996 12:00:00 AM | A | FAIL |
|
|
04/12/96 330 - provide letter from eng. addressing pipe size changes (1 sch change fron sch 40 to astm 2241 200 psi
|
PLM96-00896
| INSP - Sewer and Water lines | 4/15/1996 | 4/15/1996 | 4/15/1996 12:00:00 AM | P | PASS |
|
|
04/15/96 330 - READY ANYTIME ì
|
PLM96-00158
| INSP - Final | 4/15/1996 | 4/15/1996 | 4/15/1996 12:00:00 AM | P | PASS |
|
|
04/15/96 330 -
|