ELE02-00871
| Permanent Service | 4/10/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | A | FAIL |
|
|
###-#### called needs #4 copper to water system 4/15/2002 11:04:09 AM
|
ELE02-00810
| Permanent Service | 4/10/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | A | PASS |
|
|
###-####
p/s o/h rec. ok 4/15/2002 10:38:54 AM
|
ELE01-04055
| Final | 4/11/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | A | FAIL |
|
|
###-#### OR ###-#### CALL FIRST
cor. posted called $42.00 reinspection fee due 250.8 300.10 RE washers, 250.52 or 104, 110.14 cop. and alum under wire nut 250.64(B) protect #8 copper GEC at pool house 4/15/2002 5:42:59 PM
|
ELE01-03925
| Final | 4/12/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 14:36:38. Contact: ###-####.
called 4/15/2002 9:57:42 AM
|
ELE02-01051
| Rough-In Permanent Service | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | FAIL |
|
|
###-#### dog tied up gate open todd called need too meet with contractor COW 4/15/2002 4:24:41 PM
|
ELE02-01063
| Rough-In Permanent Service | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | PART |
|
|
###-#### chad r/i ok for garage addition p/s not ready 4/15/2002 4:54:29 PM
|
ELE02-01065
| Temporary Service | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | FAIL |
|
|
###-#### LLOYD cor. posted called 110.12(C) replace burnt busing clean out dirt seal breaker KO, 527.6 provide gfci protection, 230.24(B) needs 10 ft clearence from grade too drip loop 4/15/2002 1:52:38 PM
|
ELE02-01068
| Permanent Service | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | FAIL |
|
|
or 1hr before you go ###-#### cor. posted called left # 200.7 shall not use white wire for phase conductors 250.8 no SMS jbox, 250.52,or 104 if electrode within 5ft if not bond anyplace, 310.15 derate conductors over there in a raceway 4/15/2002 4:24:11 PM
|
ELE02-00775
| Electrical Rough-In | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | NR |
|
|
GEORGE ###-####
|