ELE02-01058
| Temporary Service | 4/12/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | A | PASS |
|
|
###-####. temporary service
t/s oh plantation west #1058-ok 4/15/2002 8:47:46 AM
|
ELE02-01060
| Temporary Service | 4/12/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | A | PASS |
|
|
###-####. temporary service
t/s oh van zandt ele #1060-ok 4/15/2002 9:30:59 AM
|
ELE02-00998
| Electrical Rough-In | 4/12/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 16:43:57. Contact: ###-####. kitchen remodel r/i. 4/15/2002 9:12:50 AM
|
ELE02-01057
| Electrical Rough-In | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/15/2002 at 06:32:52. Contact: ###-####. suite 101; walls r/i 4/15/2002 10:01:33 AM
|
ELE02-00428
| Permanent Service | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | PASS |
|
|
jim ###-####. ufer grounding conductor ok for concrete pour,. 4/15/2002 10:17:07 AM
|
ELE02-00818
| Final | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | PASS |
|
|
fn elks rehab- go tofront desk-- ask for greg hines-ques pat ###-####
|
ELE02-00542
| Electrical Rough-In | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | FAIL |
|
|
room above gar- ###-#### pat. windows not installed on r/i. called contractor to reschedule when installed. 4/15/2002 1:30:35 PM
|
ELE02-00689
| Final | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | PASS |
|
|
fn insp ###-####- susie
|