BLD01-03112
| BLD-Framing/Rough-in | 4/12/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | A | PART |
|
|
pete ###-#### roof deck nailing ok 4/15/2002 9:23:45 AM
|
MEC02-00986
| Rough-in | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/15/2002 at 08:43:27. Contact: ###-####. cn posted venting system must br enclosed 4/15/2002 1:35:06 PM 4/15/2002 1:35:52 PM
|
BLD02-00570
| BLD-Framing/Rough-in | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | PASS |
|
|
###-#### dave needs fire stop at pents in wall can see at grid inspection 4/15/2002 2:15:16 PM
|
BLD02-00272
| BLD-Final | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | NR |
|
|
###-#### ALAN 4/15/2002 3:14:02 PM needs other sigs 4/15/2002 3:14:20 PM
|
BLD02-00738
| BLD-Foundation | 4/15/2002 | 4/15/2002 | 4/15/2002 12:00:00 AM | P | PASS |
|
|
###-#### gale
|