ELE03-00649
| Electrical Rough-In | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/15/2003 at 7:24:53 AM. Contact: ###-####.
|
ELE03-01074
| Electrical Rough-In | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/15/2003 at 7:46:22 AM. Contact: ###-####. Ufer ground
|
ELE02-03835
| Final | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | PASS |
|
|
Per Jim Schmer at 12:30pm
|