ELE02-03149
| Final | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | PASS |
|
|
KEN ###-#### PLEASE CALL
this is for a play area with light in back 4/15/2003 10:42:58 AM
|
ELE03-01061
| Electrical Rough-In | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/14/2003 at 11:53:37 AM. Contact: ###-####.
Walls ok 4/15/2003 11:04:43 AM
|
ELE03-01079
| Final | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | PASS |
|
|
We ran a new 60amp 3phase ckt. from their existing ckt. breaker disconnect inside the Boiler room, to the hydraulic unit for their big trash compactor. This hydraulic unit is located at the east end of the compactor, and you can follow the 1" emt back to the Boiler room. Bill Canfield, or Jamie (plant mechanics)can let you into the Boiler room. ; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
ELE03-00527
| Final | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | FAIL |
|
|
STEVE PLEASE CALL BEFORE SO STEVE CAN UNLOCK THE DOOR; Phone #: ###-#### Internet Inspection Request from: Darla Downs
grounding is a mess and requires stiff leg on mast 4/15/2003 10:39:47 AM
|
ELE01-04078
| Final | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | PASS |
|
|
|
ELE03-00520
| Electrical Rough-In | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/15/2003 at 6:59:01 AM. Contact: ###-####.
North 1/3 u/g ok 4/15/2003 9:37:19 AM
|
ELE03-00026
| Electrical Rough-In | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | PART |
|
|
JESSIE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
anop 4/15/2003 4:43:53 PM
|
ELE03-00073
| Electrical Rough-In | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | PART |
|
|
###-#### ceiling inspection
2nd floor 4/15/2003 4:26:30 PM
|
ELE02-02468
| Final | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | FAIL |
|
|
call first to meet there ###-#### Sean Thompson
posted stop work work done by unlicensed contractor under homeowners permit no R/I inspection done yet 4/15/2003 1:57:18 PM
|
ELE03-00756
| Electrical Rough-In | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/14/2003 at 12:34:59 PM. Contact: ###-####.
|