BLD03-00335
| BLD-Footing | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | PASS |
|
|
MARTIN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
MIS03-00066
| BLD-Final | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | PASS |
|
|
###-#### Stan call first to meet there. 4/15/2003 10:20:13 AM. Went out to site burned area at rear, an engineer has been contracted to provide repair details for structural issues. 4/16/2003 10:58:58 AM
|
BLD03-00251
| BLD-Framing/Rough-in | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | PART |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Annette Moorewalls ok pendingenginners report on hvac penetration. 4/15/2003 5:07:11 PM
|
BLD02-01802
| BLD-Final | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | FAIL |
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Annette Moorec/n posted. 4/15/2003 5:09:33 PM
|
BLD02-02471
| BLD-Framing/Rough-in | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 4/14/2003 at 7:45:11 PM. Contact: ###-####.posted a c/n. 4/16/2003 11:02:31 AM
|
MEC03-00928
| Rough-in | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD03-00288
| BLD-Framing/Rough-in | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | PASS |
|
|
###-####. framing ok I had allready left an ok to insulate but, this house is not yet insulated. 4/15/2003 2:48:11 PM
|