BLD02-02945
| BLD-Other | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | PART |
|
|
jack seismic on racking; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/N issued--Racks #H and K need attached to walls per eng. Signs prior to final. Interior racks ok. 4/15/2003 9:00:12 AM
|
BLD02-02259
| BLD-Conference | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | PASS |
|
|
KEN ###-####
|
MEC03-00917
| Rough-in | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | PASS |
|
|
b j ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
MEC03-00917
| Pressure Test | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | CANC |
|
|
b j ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Cancelled by contractor-no p.test. 4/15/2003 10:06:48 AM
|
MIS03-00067
| BLD-Conference | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | CANC |
|
|
TONY, THIS IS THE COMPLAINT : ADD ON TO HOUSE( CARPORT/SHED ?? ) W/O PERMITS AND UP TO PROPERTY LINE.. Transfered to Inspector 415 per George for Wednesday. 4/15/2003 7:36:58 AM
|
BLD03-00008
| BLD-Footing | 4/14/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | A | PART |
|
|
joel; Phone #: ###-#### Internet Inspection Request from: Annette Moore wip--front retaining wall and lower downhill side. 4/15/2003 11:12:50 AM
|
BLD03-00555
| BLD-Framing/Rough-in | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung--Front porch footing on frost wall not framing. Exceeds approved plan. 4/15/2003 3:01:10 PM
|
BLD03-00581
| BLD-Foundation | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | PART |
|
|
logan; Phone #: ###-#### Internet Inspection Request from: Annette Moore wip-95 % ready--all but hd's at time of inspection. 4/15/2003 3:26:00 PM
|
BLD03-00601
| BLD-Foundation | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | PART |
|
|
JAY THEY WILL BE Pouring AT 1;30; Phone #: ###-#### Internet Inspection Request from: Darla Downs 90% ready--wip--basement section--rebar in place. 4/15/2003 1:58:49 PM
|
ESC03-00341
| Site Preparation | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | P | FAIL |
|
|
Talked to rp--d. wood--###-####--track-out needs cleaned, port-a-pot needs moved, storm-drain inlet needs protection--completed by closing today. Will perform follow-up inspection tomorrow. 4/15/2003 2:05:22 PM
|