BLD00-03414
| BLD-Grading Inspection | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | | PASS |
|
|
Final grading and drainage is approved.
|
BLD03-00690
| BLD-Grading Inspection | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | | DONE |
|
|
Geotechnical engineer has approved the pier subgrade. However, the northernmost hole must have 3 to 4 inches of loose sand removed prior to placement of the concrete.
|
BLD03-00581
| BLD-Grading Inspection | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | | DONE |
|
|
Geotechnical engineer has approved the footing subgrade
|
BLD03-00524
| BLD-Grading Inspection | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | | DONE |
|
|
Geotech has approved footing subgrade provided all loose or disturbed soil is removed from the footing trenches prior to placing concrete.
|
BLD03-00194
| BLD-Grading Inspection | 4/15/2003 | 4/15/2003 | 4/15/2003 12:00:00 AM | | DONE |
|
|
GEOTECH ENGINEER HAS APPROVED THE FOOTING SUBGRADE
|