Inspections for the day of: Friday, April 15, 2005.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM05-01143 Water and/or Sewer4/14/20054/15/20054/15/2005 12:00:00 AMAPASS
eric ###-#### water service final ok 4/15/2005 9:03:09 AM
PLM05-00232 Final4/14/20054/15/20054/15/2005 12:00:00 AMAPASS
brett; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles final ok 4/15/2005 9:39:44 AM
PLM05-01156 Water and/or Sewer4/14/20054/15/20054/15/2005 12:00:00 AMAPART
CONNECTION OF NEW WATER LINE IN BUILDING; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL just needs testing 4/15/2005 8:33:08 AM
PLM04-03445 Final4/14/20054/15/20054/15/2005 12:00:00 AMAPASS
###-#### late am if possible. will need to permit lav when its set, waste is capped off, final ok 4/15/2005 10:01:08 AM
PLM05-01117 Plumbing Rough-in4/14/20054/15/20054/15/2005 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Kim Alderson ri ok 4/15/2005 10:44:37 AM
PLM05-00647 Final4/14/20054/15/20054/15/2005 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Kim Alderson final ok 4/15/2005 8:51:00 AM
PLM05-01126 Water and/or Sewer4/15/20054/15/20054/15/2005 12:00:00 AMAPASS
outside water replacement final ok 4/15/2005 8:37:53 AM
PLM05-01187 Water and/or Sewer4/15/20054/15/20054/15/2005 12:00:00 AMAPASS
per bill send to him for insp for water line well disconnect ok existing water service final ok 4/15/2005 2:58:36 PM
PLM05-01142 Water and/or Sewer4/15/20054/15/20054/15/2005 12:00:00 AMPPASS
sw ok 4/15/2005 3:39:27 PM
PLM04-03781 Final4/15/20054/15/20054/15/2005 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 4/15/2005 at 9:07:40 AM. Contact: ###-####. part only, office only 4/15/2005 2:07:04 PM
PLM05-00469 Final4/15/20054/15/20054/15/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/15/2005 at 9:19:30 AM. Contact: ###-####. final ok 4/15/2005 3:07:32 PM
PLM05-00470 Final4/15/20054/15/20054/15/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/15/2005 at 9:20:39 AM. Contact: ###-####. final ok 4/15/2005 3:07:25 PM
PLM05-00406 Final4/15/20054/15/20054/15/2005 12:00:00 AMPFAIL
Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht air gap required on sink wastes and ice bin drain, calk all fixtures, set soda dispensor, test all backflow preventors, provide water to soap dispensor at mop sink, include shutoff valve and pvb, dcva required at ice tea brewer/coffee maker, pvb required at steam unit by fryer, thermol expantion protection required. 4/15/2005 4:45:57 PM
PLM05-01161 Water and/or Sewer4/15/20054/15/20054/15/2005 12:00:00 AMPCANC
###-#### hollie
PLM05-01162 Water and/or Sewer4/15/20054/15/20054/15/2005 12:00:00 AMPCANC
holly ###-####
PLM05-01142 Groundwork4/15/20054/15/20054/15/2005 12:00:00 AMPPASS
Per Joe, By Lisa; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel gw ok 4/15/2005 3:39:37 PM