Inspections for the day of: Friday, April 15, 2005.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Kinnear
TitleELE-INSPECTOR
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE04-03337 Electrical Rough-In4/15/20054/15/20054/15/2005 4:14:46 PMPFAIL
Scheduled by a contractor via Hello! on 4/15/2005 at 10:02:05 AM. Contact: ###-####. junction box have been cover with vaper barrer needs to expose before ceiling can be done
ELE05-00094 Final4/14/20054/15/20054/15/2005 4:10:11 PMPPASS
Scheduled by a contractor via Hello! on 4/14/2005 at 8:47:35 AM. Contact: ###-####. ok final wall sign
ELE05-00340 Final4/15/20054/15/20054/15/2005 4:09:38 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok final
ELE05-01249 Temporary Service4/14/20054/15/20054/15/2005 4:09:08 PMPPASS
Internet Inspection Request from: Bob Glenn t/s u/g n ok
ELE05-01265 Temporary Service4/15/20054/15/20054/15/2005 4:08:33 PMPPASS
clyde moved to pm
t/s u/g n ok
ELE05-01246 Final4/15/20054/15/20054/15/2005 2:38:06 PMPCANC
brian-- ###-#### called they not ready
ELE05-01244 Final4/15/20054/15/20054/15/2005 2:37:31 PMPCANC
brain-- ###-#### called they not ready
ELE05-01278 Rough-In Permanent Service4/15/20054/15/20054/15/2005 2:36:47 PMPNR
We replaced the old small Panel "MS" with a new larger one in the exact same location.We then installed 2 new 3phase circuits(#22-24-26, & #21-23-25) from this Panel "MS" to 2 new non-fused disconnects with 2 new twist-lok receptacles below them. This is
ELE05-00145 Final4/14/20054/15/20054/15/2005 12:09:40 PMAPASS
Scheduled by a contractor via Hello! on 4/14/2005 at 8:41:49 AM. Contact: ###-####. ok wall sign
ELE05-00860 Final4/14/20054/15/20054/15/2005 12:09:08 PMAPASS
Scheduled by a contractor via Hello! on 4/14/2005 at 10:55:43 AM. Contact: ###-####. corrections made ok final
ELE05-00518 Final4/14/20054/15/20054/15/2005 11:32:22 AMAPASS
Scheduled by a contractor via Hello! on 4/14/2005 at 9:50:54 AM. Contact: ###-####. ok final
ELE05-01076 Rough-In Permanent Service4/14/20054/15/20054/15/2005 9:57:16 AMAPASS
Internet Inspection Request from: Bob Glenn ok cover ri
p/s u/g n ok
ELE05-01077 Rough-In Permanent Service4/14/20054/15/20054/15/2005 9:56:37 AMAPASS
Internet Inspection Request from: Bob Glenn ok cover ri
p/s u/g n ok
ELE05-00716 Final4/14/20054/15/20054/15/2005 9:27:19 AMAPART
Scheduled by a contractor via Hello! on 4/14/2005 at 5:59:34 PM. Contact: ###-####. ok temp occ note needs ext lights installed -- inuse cover on roof top units outlets-- sealing for walkin coolers
ELE05-01263 Electrical Rough-In4/14/20054/15/20054/15/2005 9:24:47 AMAPART
under slab insp -- bill ###-#### ok cover under slab conduit
ELE05-01224 Temporary Service4/14/20054/15/20054/15/2005 9:23:37 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
t/s u/g n ok
ELE05-01265 Temporary Service4/14/20054/15/20054/15/2005 7:39:18 AMACANC
clyde ###-####//LEM resched to pm inspection