BLD05-00337
| FIRE-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 4:44:35 PM | A | PASS |
|
|
fire life safety finaled
|
BLD04-02926
| FIRE-Final Inspection | 4/15/2005 | 4/15/2005 | 4/15/2005 4:44:00 PM | P | PASS |
|
|
fire life safety finaled
|
FIR05-00153
| INSP-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 4:26:19 PM | A | PASS |
|
|
Fire alarm finaled
|
BLD05-00558
| FIRE-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 2:36:43 PM | A | PASS |
|
|
Fire life safety finaled
|
BLD04-02864
| FIRE-Final Inspection | 4/15/2005 | 4/15/2005 | 4/15/2005 2:31:44 PM | P | PASS |
|
|
Fire life safety finaled. Am PM Locks is on the way to install the restroom hardware.
|
BLD05-00631
| FIRE-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 12:51:05 PM | A | FAIL |
|
|
Addtional racks have been installed along the north wall infront of one of the exterior doors. Resubmit plans
|
BLD04-02940
| FIRE-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 11:50:49 AM | A | FAIL |
|
|
Need to provide signage per IFC 608.6 and seismic bracing per 608.7
|
BLD04-02269
| FIRE-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 11:21:32 AM | A | PASS |
|
|
Fire life safety finaled
|
BLD04-02978
| FIRE-Sprinkler Rough-in | 4/14/2005 | 4/15/2005 | 4/15/2005 10:49:00 AM | A | PASS |
|
|
Ceilings and pendant sprinklers added in the three rooms that previously did not have ceilings. Sprinklers in these rooms ok to cover
|
FIR05-00216
| INSP-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 10:41:11 AM | A | FAIL |
|
|
Power and gas shut off but signal did not go to fire alarm panel.
|
BLD04-01659
| FIRE-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 10:03:28 AM | A | PASS |
|
|
Fire life safety finaled
|
BLD04-02886
| FIRE-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 9:46:09 AM | A | FAIL |
|
|
Need to provide the correct reomote annunciators for the duct smoke detectors. Duct smoke detectors are mounted in the wrong location in one spot. Contractor to verify correct locations for the other three. Need to test duct smoke detectors when finished.
|
FIR04-00590
| INSP-Final Inspection | 4/13/2005 | 4/15/2005 | 4/15/2005 9:15:28 AM | A | FAIL |
|
|
See approved plans for locations where smoke detectors are overspaced
|
FIR04-00708
| INSP-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 8:41:03 AM | A | FAIL |
|
|
Couldn't set off system due to missing part and no tie in to the existing fire alarm system. No inspection done
|
BLD04-02648
| FIRE-Final Inspection | 4/14/2005 | 4/15/2005 | 4/15/2005 8:38:51 AM | A | PASS |
|
|
fire lfie safety finaled
|
FIR05-00126
| INSP-Final Inspection | 4/15/2005 | 4/15/2005 | 4/15/2005 12:00:00 AM | P | PASS |
|
|
Fire sprinkler finaled
|
FIR05-00153