Inspections for the day of: Wednesday, April 15, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00133 INSP-Sprinkler Rough-in4/15/20094/15/20094/15/2009 4:07:58 PMPPASS
The remaining piping rough-in for the west end is passed. The blocked upright and the missing upright previously noted have been corrected. A separate rough-in inspection will be required when the drops in the lay-in ceiling areas have been finished.
BLD09-00201 FIRE-Final Inspection4/14/20094/15/20094/15/2009 4:06:14 PMPFAIL
Provide single action hardware on the rear exit door and the new restroom door. Remove the large bar/dead bolt from the rear door.
FIR08-00760 INSP-Final Inspection4/14/20094/15/20094/15/2009 1:47:55 PMPPASS
Permit finaled. The underground flush passed. The contractor is to install a 1/2" plug on the outside alarm bell back box as discussed.
FIR08-00270 INSP-Final Inspection4/14/20094/15/20094/15/2009 1:17:26 PMAPASS
The sign at the FDC has been provided. Permit is finaled.
BLD09-00434 FIRE-Final Inspection4/14/20094/15/20094/15/2009 10:51:04 AMAPASS
life safety passed
FIR09-00027 INSP-Sprinkler Rough-in/Hydro4/14/20094/15/20094/15/2009 9:48:35 AMAPASS
The underground hydro test passed
BLD09-00088 FIRE-Final Inspection4/14/20094/15/20094/15/2009 9:24:42 AMAPASS
life safety passed