FIR09-00133
| INSP-Sprinkler Rough-in | 4/15/2009 | 4/15/2009 | 4/15/2009 4:07:58 PM | P | PASS |
|
|
The remaining piping rough-in for the west end is passed. The blocked upright and the missing upright previously noted have been corrected. A separate rough-in inspection will be required when the drops in the lay-in ceiling areas have been finished.
|
BLD09-00201
| FIRE-Final Inspection | 4/14/2009 | 4/15/2009 | 4/15/2009 4:06:14 PM | P | FAIL |
|
|
Provide single action hardware on the rear exit door and the new restroom door. Remove the large bar/dead bolt from the rear door.
|
FIR08-00760
| INSP-Final Inspection | 4/14/2009 | 4/15/2009 | 4/15/2009 1:47:55 PM | P | PASS |
|
|
Permit finaled. The underground flush passed. The contractor is to install a 1/2" plug on the outside alarm bell back box as discussed.
|
FIR08-00270
| INSP-Final Inspection | 4/14/2009 | 4/15/2009 | 4/15/2009 1:17:26 PM | A | PASS |
|
|
The sign at the FDC has been provided. Permit is finaled.
|
BLD09-00434
| FIRE-Final Inspection | 4/14/2009 | 4/15/2009 | 4/15/2009 10:51:04 AM | A | PASS |
|
|
life safety passed
|
FIR09-00027
| INSP-Sprinkler Rough-in/Hydro | 4/14/2009 | 4/15/2009 | 4/15/2009 9:48:35 AM | A | PASS |
|
|
The underground hydro test passed
|
BLD09-00088
| FIRE-Final Inspection | 4/14/2009 | 4/15/2009 | 4/15/2009 9:24:42 AM | A | PASS |
|
|
life safety passed
|