BLD09-01039
| FIRE-Final Inspection | 4/15/2010 | 4/15/2010 | 4/16/2010 7:25:16 AM | A | PASS |
|
|
Corrections finished, inspection passed.
|
BLD10-00094
| FIRE-Final Inspection | 4/15/2010 | 4/15/2010 | 4/15/2010 6:00:50 PM | P | PASS |
|
|
Fire life safety inspection passed, c/n items verified for completion.
|
FIR07-00197
| INSP-Final Inspection | 4/14/2010 | 4/15/2010 | 4/15/2010 5:59:43 PM | P | DEFR |
|
|
Inspection intended to be scheduled for 4/16 per contractor.
|
FIR06-00754
| INSP-Final Inspection | 4/14/2010 | 4/15/2010 | 4/15/2010 5:59:20 PM | P | DEFR |
|
|
Inspection intended to be scheduled for 4/16 per contractor.
|
FIR10-00075
| INSP-Supply line flush | 4/15/2010 | 4/15/2010 | 4/15/2010 5:57:51 PM | P | PART |
|
|
UG fire supply line flush completed satisfactory, test certificates signed.
|
BLD09-02291
| FIRE-Alarm Testing | 4/15/2010 | 4/15/2010 | 4/15/2010 5:55:31 PM | A | PART |
|
|
Relays at access control mag locks at both the south and west exits tested satisfactory for compliance with IFC 2006 sec. 1008.1.3.4 item #4.
|
BLD10-00406
| FIRE-Final Inspection | 4/15/2010 | 4/15/2010 | 4/15/2010 5:51:06 PM | A | PASS |
|
|
Fire life safety is satisfactory, inspection passed.
|
FIR10-00075
| INSP-Sprinkler Rough-in/Hydro | 4/14/2010 | 4/15/2010 | 4/15/2010 5:20:36 PM | A | PART |
|
|
UG fire supply line hydrostatic test passed inspection.
|