ESC09-00352
| Conference | 4/15/2010 | 4/15/2010 | 4/15/2010 3:08:15 PM | P | PASS |
|
|
Ped. Bridge: Reviewed de-watering and discussion took place on further scope of work. Met with Wetlands Group and Brighton plus Inspector 460. Discharge of water is required to be within state water quality standards for turbidity. Upon completion site stabilzation will be expected.
|
ESC10-00268
| Site Preparation | 4/15/2010 | 4/15/2010 | 4/15/2010 7:50:33 AM | | CANC |
|
|
Passed by inspector 316 on 4/13/10
|