BLD10-00550
| FIRE-Final Inspection | 4/15/2011 | 4/15/2011 | 4/18/2011 4:27:00 PM | A | PART |
|
|
Reinspection scheduled 4/19 AM.
|
FIR11-00129
| INSP-Final Inspection | 4/15/2011 | 4/15/2011 | 4/18/2011 4:03:33 PM | P | PASS |
|
|
Fire sprinkler permit work approved for final status.
|
FIR11-00097
| INSP-Final Inspection | 4/15/2011 | 4/15/2011 | 4/18/2011 4:02:32 PM | P | PASS |
|
|
Scope of work completed. Fire sprinkler permit finaled.
|
BLD10-02172
| FIRE-Final Inspection | 4/15/2011 | 4/15/2011 | 4/15/2011 4:40:14 PM | P | PART |
|
|
Verified offsite monitoring for the fire sprinkler system. Final pending stem at the wall post indicator valve to the NRS at the riser.
|
BLD10-00974
| FIRE-Final Inspection | 4/15/2011 | 4/15/2011 | 4/15/2011 4:39:46 PM | P | PART |
|
|
Verified offsite monitoring for the fire sprinkler system. Final pending stem at the wall post indicator valve to the NRS at the riser.
|
FIR11-00112
| INSP-Final Inspection | 4/14/2011 | 4/15/2011 | 4/15/2011 4:36:17 PM | A | PASS |
|
|
Scope of fire sprinkler work passed final inspection. Noted existing system is overdue annual inspection and will need to be made current prior to building permit fire life safety final.
|
FIR11-00101
| INSP-Final Inspection | 4/14/2011 | 4/15/2011 | 4/15/2011 4:34:03 PM | A | FAIL |
|
|
Noted overspaced coverage at the design room adjacent to the new sheetrock partition wall at the roof deck to patio access storefront.
|
BLD11-00554
| FIRE-Final Inspection | 4/15/2011 | 4/15/2011 | 4/15/2011 4:29:53 PM | A | NR |
|
|
Pending correction items.
|
FIR08-00802
| INSP-Final Inspection | 4/14/2011 | 4/15/2011 | 4/15/2011 4:29:19 PM | A | PASS |
|
|
Sprinkler monitoring only including offsite reporting verified for functionality.
|