FIR14-00767
| INSP-Sprinkler Rough-in | 4/15/2015 | 4/15/2015 | 4/16/2015 6:45:01 AM | P | CANC |
|
|
Brian Phone #: ###-####
|
FIR14-00765
| INSP-Sprinkler Rough-in | 4/15/2015 | 4/15/2015 | 4/16/2015 6:44:06 AM | P | PASS |
|
|
Overhead rough-in passed. Piping can not be covered until a tenting inspection is passed
|
FIR14-00763
| INSP-Sprinkler Rough-in | 4/15/2015 | 4/15/2015 | 4/16/2015 6:43:23 AM | P | PASS |
|
|
Underground supply is ok to cover
|
FIR15-00150
| INSP-Alarm Testing | 4/13/2015 | 4/15/2015 | 4/16/2015 6:42:23 AM | P | DONE |
|
|
Todays inspection consisted of verifying that the panel model, NAC model, phone lines, batteries, wire guage at the FACP, revised horn/strobe layout and initial smoke detector layout was correct. Noted corrections are missing smoke detectors in the Garden Room, need strobe coverage in Laundry Room in Memory Care and possible strobe coverage in the east corridor area just outside of Memory Care. Also no sprinkler devices were checked. Missing Knox box and map at the FACP. Need to verify all requirements in the review comments and the revised drawings have been met.
|
FIR15-00152
| INSP-Sprinkler Rough-in/Hydro | 4/14/2015 | 4/15/2015 | 4/15/2015 11:55:29 AM | A | PASS |
|
|
Main Rest Rooms ok to cover.
|
FIR14-00757
| INSP-Sprinkler Rough-in/Hydro | 4/14/2015 | 4/15/2015 | 4/15/2015 11:53:19 AM | A | PASS |
|
|
Underground ok to cover
|
BLD13-01449
| FIRE-Final Inspection | 4/13/2015 | 4/15/2015 | 4/15/2015 9:41:58 AM | A | FAIL |
|
|
Inspection was actually for a conference to go over life safety requirements. Cory Phone #: ###-####
|
BLD14-02284
| FIRE-Final Inspection | 4/14/2015 | 4/15/2015 | 4/15/2015 7:53:11 AM | A | FAIL |
|
|
Provide exit sign at corridor for second exit as per plans, provide testing of all exit signs and emergency lights, provide contrasting address numbers, blank the deadbolt to the office, remove thumbturn lock at main exit (keyed is ok)
|