PLM96-00868
| INSP - Sprinkler & Backflow | 4/15/1996 | 4/16/1996 | 4/16/1996 12:00:00 AM | A | PASS |
|
|
04/15/96 330 -
|
PLM96-00901
| INSP - Plumbing Rough-in | 4/16/1996 | 4/16/1996 | 4/16/1996 12:00:00 AM | P | PASS |
|
|
04/16/96 330 - 9 fixtures
|
PLM96-00902
| INSP - Plumbing Rough-in | 4/16/1996 | 4/16/1996 | 4/16/1996 12:00:00 AM | P | PASS |
|
|
04/16/96 330 - 9 fixtures
|
PLM96-00905
| INSP - Plumbing Rough-in | 4/16/1996 | 4/16/1996 | 4/16/1996 12:00:00 AM | P | PASS |
|
|
04/16/96 330 - BASIC 9 FIXTURES
|
PLM96-00908
| INSP - Plumbing Rough-in | 4/16/1996 | 4/16/1996 | 4/16/1996 12:00:00 AM | P | PASS |
|
|
04/16/96 330 - BASIS 9 FIXTURES
|