ELE01-01095
| Final | 4/13/2001 | 4/16/2001 | 4/16/2001 12:00:00 AM | A | FAIL |
|
|
cheri ###-#### ###-#### same correction as Joe 4/16/2001 11:47:35 AM
|
ELE01-00742
| Final | 4/13/2001 | 4/16/2001 | 4/16/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/13/2001 at 18:10:17. Contact: ###-####. grounding and boxes flush 4/16/2001 9:36:38 AM
|
ELE01-00083
| Final | 4/16/2001 | 4/16/2001 | 4/16/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 11:26:41. Contact: ###-####.
|
ELE01-01130
| Electrical Rough-In | 4/13/2001 | 4/16/2001 | 4/16/2001 12:00:00 AM | P | PASS |
|
|
Kathy ###-####
|