MEC01-00981
| Final | 4/12/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 15:26:27. Contact: ###-####.
|
MEC02-00595
| Rough-in | 4/15/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | A | PART |
|
|
physicans dictation area only 4/16/2002 10:05:35 AM
|
MEC02-00835
| Rough-in | 4/15/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/15/2002 at 13:03:24. Contact: ###-####.
|
MEC02-00835
| Final | 4/16/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 350 On 4/16/2002 10:05:55 AM
|
MEC02-01023
| Rough-in | 4/16/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC02-01023
| Final | 4/16/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/16/2002 at 10:50:55. Contact: ###-####.
|
MEC02-00949
| Pressure Test | 4/16/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | P | PASS |
|
|
pt ok, no answer to knock on door 4/16/2002 2:12:17 PM
|
MEC02-00949
| Final | 4/16/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | P | NH |
|
|
4/16/2002 2:12:44 PM no answer to knock on door 4/16/2002 2:13:08 PM
|
MEC02-00841
| Rough-in | 4/16/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | P | NR |
|
|
dryer vents to be within manufactures requirements, which are 3 elbows and 34 feet, place tag by dryer at final 4/16/2002 4:33:53 PM
|