BLD01-00496
| FIRE-Final Inspection | 4/15/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | P | PASS |
|
|
fire life safety and fire sprinkler OK 4/16/2002 12:39:40 PM
|
BLD01-01384
| FIRE-Final Inspection | 4/15/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | P | FAIL |
|
|
provide knox box and provide the fire review notes so inspection can be completed 4/16/2002 4:21:36 PM
|
BLD01-01943
| FIRE-Final Inspection | 4/15/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | P | PASS |
|
|
FIre life/safety finaled 4/16/2002 12:24:11 PM
|
BLD01-01881
| FIRE-Final Inspection | 4/15/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | P | FAIL |
|
|
provide fire extinguisher in generator room and at the fuel tank mounted at 48" and with current inspection tags, provide fuel tank sign off by Boise Fire Dept. 4/16/2002 3:34:27 PM
|
FIR02-00090
| INSP-Sprinkler Rough-in/Hydro | 4/16/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | P | PASS |
|
|
hydro test for the dry system OK 4/16/2002 3:53:01 PM
|
FIR01-00409
| INSP-Final Inspection | 4/16/2002 | 4/16/2002 | 4/16/2002 12:00:00 AM | P | PASS |
|
|
Fire alarm system finaled
|