BLD02-02976
| BLD-Aging Inspection | 4/16/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | | PART |
|
|
Talked to Dan Doherty (Winco foods).......To go to Bldg Dept and get Occ Req card and get all finals ###-####. 4/21/2003 2:49:04 PM
|
BLD03-00362
| BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | A | PART |
|
|
###-#### Shear OK with Corr ....Retro HD to check at frame. 4/16/2003 1:32:29 PM
|
BLD03-00102
| BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 4/15/2003 at 5:00:35 PM. Contact: ###-####. C/N posted. 4/16/2003 1:31:48 PM
|
BLD03-00138
| BLD-Energy code compliance | 4/14/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | A | NR |
|
|
KEN; Phone #: ###-#### Internet Inspection Request from: Darla Downs Not ready. 4/16/2003 10:24:55 AM
|
BLD03-00189
| BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | A | CANC |
|
|
###-####
|
BLD03-00140
| BLD-Energy code compliance | 4/16/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | A | PASS |
|
|
frame Pass.
|
BLD03-00188
| BLD-Framing/Rough-in | 4/16/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | A | FAIL |
|
|
Repair holes at 1hr wall.
|
BLD03-00298
| BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 4/15/2003 at 1:06:06 PM. Contact: ###-####. Shear OK. 4/16/2003 4:14:21 PM
|
BLD03-00464
| BLD-Final | 4/15/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | P | CANC |
|
|
JIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD02-02511
| BLD-Final | 4/16/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 4/16/2003 at 7:41:31 AM. Contact: ###-####. Need Elect. No insp performed. 4/16/2003 4:14:58 PM
|