FIR03-00087
| INSP-Sprinkler Rough-in/Hydro | 4/14/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | A | PART |
|
|
john ###-#### Hydro test for the second and third floors is OK. But items on correction notices still need corrected 4/16/2003 3:32:17 PM
|
BLD03-00464
| FIRE-Final Inspection | 4/15/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | A | FAIL |
|
|
jim; Phone #: ###-#### Repair the existing exit signs, add one exit sign per plans, add one sprinkler pendant in office 138. Per Bill Alexander no permit required for adding the one pendant 4/16/2003 9:49:10 AM
|
BLD02-02471
| FIRE-Conference | 4/15/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | A | CANC |
|
|
conference was set up by the plumbing contractor . He wanted to know how to install the fire caulking for his plumbing pipe penatrations. I spoke to Dennis with Meridian Plumbling and told him to install it per the manufacturers recommendations and also gave him Russ Owens phone number 4/16/2003 4:20:03 PM
|
FIR02-00359
| INSP-Conference | 4/16/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | A | DONE |
|
|
I met with mechanical engineer Bob Tikker and architect Marv Merkal and discussed the placement of the duct smoke detectors on units 1, 2 and 3. They have decided to stick with the UMC code and provide the duct smoke detectors on the supply side of these units
|
BLD02-02945
| FIRE-Final Inspection | 4/16/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | P | PASS |
|
|
jack; Phone #: ###-#### Life safety finaled for racks. No product is on site for verification of quantity 4/16/2003 2:42:10 PM
|
FIR03-00087
| INSP-Sprinkler Rough-in | 4/16/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | P | FAIL |
|
|
Provide fire caulking at the 2" penatration into the warehouse, provide the correct QR pendant in the 2nd floor office and provide the 4 way EQ bracing on the second floor main just before the wall penatration into the warehouse
|
FIR03-00087
| INSP-Sprinkler Rough-in/Hydro | 4/16/2003 | 4/16/2003 | 4/16/2003 12:00:00 AM | P | FAIL |
|
|
Provide city approved resubmitted plans showing all the piping changes. This deficiancy need to be added to the other inspection report for this project for this day
|