MEC07-01158
| Rough-in | 4/16/2007 | 4/16/2007 | 4/16/2007 4:30:14 PM | P | FAIL |
|
|
For questions please call Rhiannon ###-#### Thank You Phone #: ###-#### seal return air plenum, b-vent flue cannot be in return plenum
|
MEC07-01162
| Pressure Test | 4/16/2007 | 4/16/2007 | 4/16/2007 4:02:05 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/16/2007 at 9:32:15 AM. Contact: ###-####. 60# test
|
MEC06-03650
| Final | 4/16/2007 | 4/16/2007 | 4/16/2007 4:01:09 PM | P | FAIL |
|
|
Phone #: ###-#### previous c/n not completed and need to vent regulators in crawl to exterior
|
MEC07-01162
| Rough-in | 4/16/2007 | 4/16/2007 | 4/16/2007 3:59:09 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/16/2007 at 9:31:09 AM. Contact: ###-####. 60# test
|
MEC06-03431
| Final | 4/16/2007 | 4/16/2007 | 4/16/2007 3:37:35 PM | P | PASS |
|
|
Marylinn; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
MEC07-01237
| Rough-in | 4/16/2007 | 4/16/2007 | 4/16/2007 3:10:04 PM | P | PASS |
|
|
ted ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
MEC07-01255
| Rough-in | 4/16/2007 | 4/16/2007 | 4/16/2007 2:37:25 PM | P | FAIL |
|
|
inspections on units 1-8 only//Craig ###-#### left verbal correction with contractor, partail inspection
|
MEC07-01252
| Final | 4/15/2007 | 4/16/2007 | 4/16/2007 1:51:02 PM | P | PASS |
|
|
Phone #: ###-####
|
MEC07-01110
| Rough-in | 4/13/2007 | 4/16/2007 | 4/16/2007 10:33:46 AM | A | PASS |
|
|
Please inspect after 10:00am. Thanks, April. Phone #: ###-#### 20# test
|
MEC07-01146
| Rough-in | 4/13/2007 | 4/16/2007 | 4/16/2007 9:47:26 AM | A | PASS |
|
|
Greg; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
MEC06-03650
| Final | 4/13/2007 | 4/16/2007 | 4/16/2007 9:10:37 AM | A | FAIL |
|
|
Phone #: ###-#### shutoff valve shall be upstream of gas regulator, I need installer to call me, I have a question ###-####
|