ESC07-00115
| Site Preparation | 4/16/2007 | 4/16/2007 | 4/17/2007 10:49:33 AM | P | PASS |
|
|
|
ESC07-00116
| Site Preparation | 4/16/2007 | 4/16/2007 | 4/17/2007 10:49:08 AM | P | PASS |
|
|
|
ESC07-00315
| Tracking Control | 4/16/2007 | 4/16/2007 | 4/17/2007 10:41:57 AM | P | PART |
|
|
contacted RP about access control and stabilization schedule. access control will be installed today adn he will let me know by tomorrow about the stabilization schedule.
|
ESC07-00085
| Tracking Control | 4/16/2007 | 4/16/2007 | 4/16/2007 1:44:26 PM | P | PASS |
|
|
Site looks okay, all bmp's are being maintained.
|
ESC06-01162
| Tracking Control | 4/16/2007 | 4/16/2007 | 4/16/2007 1:39:17 PM | P | PASS |
|
|
Site looks okay, all bmp's are being maintained.
|
ESC06-01075
| Tracking Control | 4/16/2007 | 4/16/2007 | 4/16/2007 1:35:26 PM | P | FAIL |
|
|
verbal c/n to RP about trash maintenance needed on site. sugguested that trash container be covered to prevent trash from blowing around the site.
|
ESC06-00807
| Tracking Control | 4/16/2007 | 4/16/2007 | 4/16/2007 1:29:33 PM | P | PASS |
|
|
Site looks good, all bmp's are being maintained.
|
ESC06-01798
| Tracking Control | 4/16/2007 | 4/16/2007 | 4/16/2007 1:29:09 PM | P | PASS |
|
|
Site looks okay.
|
ESC06-00087
| Tracking Control | 4/16/2007 | 4/16/2007 | 4/16/2007 1:28:56 PM | P | PART |
|
|
Contacted RP about some minimal trackout from site and some sediment in gutters that needs addressed.
|
ESC05-01591
| Tracking Control | 4/16/2007 | 4/16/2007 | 4/16/2007 1:28:14 PM | P | PART |
|
|
contacted RP about some maintenance needed on d/i protection.
|