FIR08-00206
| INSP-Final Inspection | 4/16/2008 | 4/16/2008 | 4/16/2008 4:53:28 PM | P | PASS |
|
|
Fire alarm testing passed inspection, permit finaled.
|
FIR08-00068
| INSP-Sprinkler Rough-in/Hydro | 4/16/2008 | 4/16/2008 | 4/16/2008 4:45:40 PM | P | NR |
|
|
Work is not completed for inspection per contractor as requested.
|
FIR08-00066
| INSP-Sprinkler Rough-in | 4/16/2008 | 4/16/2008 | 4/16/2008 4:44:39 PM | P | PART |
|
|
Okayed overhead rough-in at the hard lid ceilings as red lined with todays date on stamped plans.
|
BLD07-01229
| FIRE-Final Inspection | 4/16/2008 | 4/16/2008 | 4/16/2008 4:43:18 PM | P | PASS |
|
|
Corrections verified for completion, fire life safety finaled, no inspection card on site for signature.
|
FIR08-00205
| INSP-Final Inspection | 4/14/2008 | 4/16/2008 | 4/16/2008 2:31:00 PM | A | PASS |
|
|
Fire alarm work passed field testing, permit finaled.
|
FIR08-00149
| INSP-Sprinkler Rough-in | 4/15/2008 | 4/16/2008 | 4/16/2008 2:30:24 PM | A | PART |
|
|
Overhead fire sprinkler system modifications are approved for cover at the drop ceiling, final pending ceiling tile and escutcheons.
|