ESC06-01078
| BMP Violation | 4/16/2008 | 4/16/2008 | 4/17/2008 1:13:00 PM | A | FAIL |
|
|
Need to stabilize all disurbed soil. Left message with the Project Owner. CAS #460
|
ESC07-01418
| Site Preparation | 4/16/2008 | 4/16/2008 | 4/17/2008 12:51:34 PM | P | CANC |
|
|
|
ESC07-01389
| Random Inspection | 4/16/2008 | 4/16/2008 | 4/17/2008 12:51:21 PM | P | FAIL |
|
|
Notice of Correction No ESC sign posted No construction entrance Heavy sediment in gutter pan Will re-inspect 4/18/08 Left message with RP CAS #460
|
ESC06-00200
| Site Preparation | 4/16/2008 | 4/16/2008 | 4/16/2008 4:08:33 PM | P | PASS |
|
|
Landscape complete. CAS #460
|
ESC06-00579
| Site Final | 4/16/2008 | 4/16/2008 | 4/16/2008 4:07:59 PM | P | PASS |
|
|
Site is fully stabilized. CAS #460
|
ESC07-00708
| Site Final | 4/16/2008 | 4/16/2008 | 4/16/2008 3:54:18 PM | P | FAIL |
|
|
Landscape not completed. Talked with RP. CAS #460
|
ESC06-00686
| Site Preparation | 4/16/2008 | 4/16/2008 | 4/16/2008 2:43:35 PM | P | CANC |
|
|
|
ESC06-00686
| BMP Violation | 4/16/2008 | 4/16/2008 | 4/16/2008 2:43:25 PM | P | FAIL |
|
|
Notice of Correction Stabilize all disturbed soil/ stockpiles on project that have been or will be dormit 30 days. Will re-inspect on Friday the 04/18/08 CAS #460
|
ESC07-00777
| Site Preparation | 4/16/2008 | 4/16/2008 | 4/16/2008 2:07:38 PM | P | CANC |
|
|
|
ESC07-00777
| Site Final | 4/16/2008 | 4/16/2008 | 4/16/2008 2:07:30 PM | P | FAIL |
|
|
Final Landscape not complete.
|
ESC03-01523
| Site Final | 4/16/2008 | 4/16/2008 | 4/16/2008 12:33:31 PM | P | PASS |
|
|
Completed
|
ESC04-01376
| Site Final | 4/16/2008 | 4/16/2008 | 4/16/2008 12:33:13 PM | P | PASS |
|
|
Completed
|
ESC07-01328
| Site Final | 4/16/2008 | 4/16/2008 | 4/16/2008 12:28:39 PM | P | FAIL |
|
|
Disturbed soil not stabilized.
|
ESC07-01572
| Site Preparation | 4/16/2008 | 4/16/2008 | 4/16/2008 9:43:59 AM | A | PASS |
|
|
Sign posted and Trash container supplied. All D.I. protected. Looks good CAS #460
|
ESC08-00112
| Random Inspection | 4/16/2008 | 4/16/2008 | 4/16/2008 9:26:29 AM | A | PASS |
|
|
Sign posted at front of lot and Trash bin also at front of lot. CAS #460
|
ESC07-01472
| Random Inspection | 4/16/2008 | 4/16/2008 | 4/16/2008 9:04:25 AM | A | FAIL |
|
|
Need to stabilize stockpiles on project. Also need to clean up gutter pan along Shamrock. Left a message with the RP. CAS #460
|
ESC07-00661
| Site Final | 4/16/2008 | 4/16/2008 | 4/16/2008 8:57:28 AM | A | PASS |
|
|
Final landscaping has been installed. CAS #460
|
ESC07-00669
| Random Inspection | 4/16/2008 | 4/16/2008 | 4/16/2008 8:56:58 AM | A | FAIL |
|
|
need to clean up access in between lots off trash debris and sweep up sediment. CAS #460
|
ESC07-00663
| Site Final | 4/16/2008 | 4/16/2008 | 4/16/2008 8:55:54 AM | A | PASS |
|
|
Final landscaping has been installed. CAS #460
|
ESC07-00664
| Site Final | 4/16/2008 | 4/16/2008 | 4/16/2008 8:55:39 AM | A | PASS |
|
|
Final landscaping has been installed. CAS #460
|
ESC07-00665
| BMP Violation | 4/16/2008 | 4/16/2008 | 4/16/2008 8:55:01 AM | A | FAIL |
|
|
Need to post ESC sign a the front of lot. CAS #460
|
ESC07-00666
| BMP Violation | 4/16/2008 | 4/16/2008 | 4/16/2008 8:54:12 AM | A | FAIL |
|
|
Need to post ESC sign and pick up trash debis around lot. CAS #460
|
ESC07-01093
| Random Inspection | 4/16/2008 | 4/16/2008 | 4/16/2008 8:32:33 AM | A | PART |
|
|
Discussed with RP over trash pick up and tracking clean up after dirt work is finish at the end of the day. CAS #460
|
ESC07-01092
| Random Inspection | 4/16/2008 | 4/16/2008 | 4/16/2008 8:32:20 AM | A | PART |
|
|
Discussed with RP over trash pick up and tracking clean up after dirt work is finish at the end of the day. CAS #460
|
ESC07-01076
| Random Inspection | 4/16/2008 | 4/16/2008 | 4/16/2008 8:32:03 AM | A | PART |
|
|
Discussed with RP over trash pick up and tracking clean up after dirt work is finish at the end of the day. CAS #460
|
ESC07-01077
| Random Inspection | 4/16/2008 | 4/16/2008 | 4/16/2008 8:31:49 AM | A | PART |
|
|
Discussed with RP over trash pick up and tracking clean up after dirt work is finish at the end of the day. CAS #460
|