Inspections for the day of: Thursday, April 16, 2009.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00234 INSP-Final Inspection4/13/20094/16/20094/17/2009 7:08:38 PMPPART
Tested notification devices for the 18th thru basement levels via one manual pull station per level, noted one non-functional speaker strobe on the 14th floor corridor, need to verify MP's at the 18th floor balcony are wp, noted audibility measurements at several condos and common corridors on the 5th thru 11th levels is not sufficient, replaced av's in the basement corridor tested okay, provide strobe notification at the fire command center as discussed. Inspection completed 4/16..
FIR08-00018 INSP-Final Inspection4/14/20094/16/20094/16/2009 4:10:58 PMANR
Work in progress to relocate floor control tamper valves, dry system trip testing could not be completed due to floor coating underway at the parking levels.
BLD07-00007 FIRE-Final Inspection4/15/20094/16/20094/16/2009 4:08:13 PMAPASS
Project related fire permits finaled, fire life safety approved for final.
FIR09-00245 INSP-Final Inspection4/16/20094/16/20094/16/2009 4:06:43 PMPPASS
Scope of fire sprinkler permit work completed, inspection finaled.
BLD09-00002 FIRE-Final Inspection4/15/20094/16/20094/16/2009 4:05:37 PMAPASS
Noted correction items verified for completion, fire life safety passed.