FIR11-00496
| INSP-Sprinkler Rough-in | 4/16/2012 | 4/16/2012 | 4/19/2012 4:50:48 PM | P | PART |
|
|
Ref. stamped plans for dated field notes at the 1st floor sheetrock ceilings okay to cover.
|
FIR11-00483
| INSP-Sprinkler Rough-in/Hydro | 4/16/2012 | 4/16/2012 | 4/19/2012 4:49:05 PM | P | PART |
|
|
Pendent head relocations at sheetrock ceilings due to fixture obstructions.
|
FIR11-00575
| INSP-Sprinkler Rough-in | 4/16/2012 | 4/16/2012 | 4/19/2012 4:47:05 PM | P | PART |
|
|
Regarding relocated SD for door release service at the non-clean link bld 50 side.
|
FIR11-00587
| INSP-Sprinkler Rough-in | 4/16/2012 | 4/16/2012 | 4/16/2012 4:22:26 PM | P | PART |
|
|
Overhead work at the grid ceilings as marked on approved plans with today's date okayed for cover.
|
FIR11-00532
| INSP-Sprinkler Rough-in | 4/13/2012 | 4/16/2012 | 4/16/2012 4:20:23 PM | A | PART |
|
|
Inspection request intended for FIR11-00587.
|
BLD12-00215
| FIRE-Final Inspection | 4/12/2012 | 4/16/2012 | 4/16/2012 4:19:05 PM | A | PASS |
|
|
Fire life safety inspection completed acceptable.
|
BLD12-00327
| FIRE-Final Inspection | 4/13/2012 | 4/16/2012 | 4/16/2012 10:56:33 AM | A | PASS |
|
|
Life safety final approved pending address numbers are posted prior to structural final as agreed.
|
BLD12-00710
| FIRE-Final Inspection | 4/13/2012 | 4/16/2012 | 4/16/2012 10:55:03 AM | A | PASS |
|
|
Correction items verified for completion. Life safety passed.
|
BLD12-00520
| FIRE-Final Inspection | 4/12/2012 | 4/16/2012 | 4/16/2012 9:54:02 AM | A | PASS |
|
|
Fire life safety inspection passed.
|