BLD11-01192
| FIRE-Conference | 4/16/2012 | 4/16/2012 | 4/16/2012 3:41:41 PM | P | DONE |
|
|
Met Darren and went over the signage requirement for fire dept access. I also noted that a 5,000 or 6,000 gallon carbon dioxide tank that had not been shown on the plans is now installed along the north property line. I contacted scott arellano and he was ok with the installation of the tank and no additional submittal were to be required. Darren also asked about the bollards at the north side tanks. I deferred him to the fire chief since their installation does not match IFC 318.
|
BLD11-03007
| FIRE-Conference | 4/13/2012 | 4/16/2012 | 4/16/2012 3:19:31 PM | A | DONE |
|
|
John McCarthy and I discussed manual fire alarm, exist discharge lighting and combustible concealed space fire sprinkler requirements for the upcoming project.
|
FIR11-00435
| INSP-Conference | 4/13/2012 | 4/16/2012 | 4/16/2012 1:45:36 PM | A | DONE |
|
|
Rob Ahten, kevin and I went over obstructions to the visual coverage. There are many cubicle walls that exceed 6' in height.
|
BLD12-00652
| FIRE-Final Inspection | 4/13/2012 | 4/16/2012 | 4/16/2012 10:58:02 AM | A | PASS |
|
|
life safety passed. The west exit door with the door mag appears to meet IFC 1008.1.9.8
|