Inspections for the day of: Tuesday, April 16, 2013.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00133 Random Inspection4/16/20134/16/20134/16/2013 4:47:50 PMPPASS
BLD13-00319 BLD-Foundation4/12/20134/16/20134/16/2013 4:47:28 PMPPASS
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
ESC13-00140 Site Preparation4/16/20134/16/20134/16/2013 4:47:03 PMPPASS
BLD13-00325 BLD-Foundation4/12/20134/16/20134/16/2013 4:46:45 PMPPASS
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
ESC13-00139 Random Inspection4/16/20134/16/20134/16/2013 4:46:22 PMPPASS
BLD13-00324 BLD-Foundation4/12/20134/16/20134/16/2013 4:46:01 PMPPASS
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD13-00318 BLD-Foundation4/12/20134/16/20134/16/2013 4:45:36 PMPPASS
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD13-00539 BLD-Conference4/15/20134/16/20134/16/2013 4:44:32 PMPDONE
Call Aaron with Questions Phone #: ###-#### >> Inspection requested via web by Aaron Vance
BLD13-00539 DOC - Permit Finaled4/16/20134/16/20134/16/2013 4:43:50 PMPPASS
ESC13-00132 Random Inspection4/16/20134/16/20134/16/2013 4:39:22 PMPPASS
ESC13-00296 Site Preparation4/16/20134/16/20134/16/2013 2:51:54 PMPPASS
BLD13-00758 BLD-Footing4/15/20134/16/20134/16/2013 2:50:29 PMPPART
Greg Phone #: ###-####
BLD13-00520 BLD-Final4/16/20134/16/20134/16/2013 1:56:05 PMPPASS
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz. ok for eprm occ. No plumbing.
BLD13-00615 BLD-Conference4/15/20134/16/20134/16/2013 1:36:12 PMPCANC
Contact Aaron with Questions Phone #: ###-#### >> Inspection requested via web by Aaron Vance
BLD13-00615 BLD-Conference4/15/20134/16/20134/16/2013 12:45:19 PMADONE
Phone #: ###-#### >> Inspection requested via web by Aaron Vance
BLD13-00615 DOC - Permit Finaled4/16/20134/16/20134/16/2013 12:44:42 PMPPASS
ESC13-00028 Random Inspection4/16/20134/16/20134/16/2013 10:28:52 AMAPASS
BLD13-00063 BLD-Energy code compliance4/12/20134/16/20134/16/2013 10:06:37 AMAPASS
Paul Phone #: ###-####
BLD12-02628 BLD-Final4/15/20134/16/20134/16/2013 9:42:05 AMAPART
Temp occ. granted at this time. Have received letter from sunrise engineering. Still waiting for final letter from special inspection agency (Terracon). I did speak to greg from terracon this morning regarding final letter and if their were any outstanding issues. Greg noted two out standing issues. 1st is regarding a high slump test, 28 day strength test met project spec and the 2nd. issue was a failing density test. Location of this test was not with in the building footprint or foundation system, but rather in the parking lot. Terracon has forwarded these issues to architect for their review. As soon as issues are resolved, will be ok for perm occ.
BLD12-03339 BLD-Final4/15/20134/16/20134/16/2013 8:59:15 AMANR
call for access code//Brett Phone #: ###-####. Need mechanical final.
BLD12-03158 BLD-Final4/15/20134/16/20134/16/2013 8:58:33 AMAPASS
Brett Phone #: ###-####
BLD12-03158 DOC - Permit Finaled4/16/20134/16/20134/16/2013 8:58:14 AMPPASS
All issues resolved.