FIR15-00082
| INSP-Sprinkler Rough-in | 4/16/2015 | 4/16/2015 | 4/16/2015 3:43:51 PM | P | PASS |
|
|
Second floor sprinkler piping is ok to cover.
|
FIR15-00013
| INSP-Sprinkler Rough-in/Hydro | 4/14/2015 | 4/16/2015 | 4/16/2015 2:53:26 PM | P | PASS |
|
|
AES Radio Final Inspection passed. Netcon was a 5.
|
FIR15-00150
| INSP-Alarm Testing | 4/13/2015 | 4/16/2015 | 4/16/2015 2:51:08 PM | A | CANC |
|
|
Called contacts phone at 9:00am and left message for working out an inspection time. Stopped at project at 9:45 to see is contact was on site but found no one. I let Scott know. I later received phone call stating that the number is a wrong number. Eric Phone #: ###-####
|
FIR14-00762
| INSP-Sprinkler Rough-in | 4/15/2015 | 4/16/2015 | 4/16/2015 2:48:42 PM | A | PASS |
|
|
Underground supply is ok to cover
|
FIR15-00038
| INSP-Sprinkler Rough-in/Hydro | 4/15/2015 | 4/16/2015 | 4/16/2015 12:22:24 PM | A | PASS |
|
|
Underground supply line and remote FDC hydro tests passed
|
FIR14-00767
| INSP-Sprinkler Rough-in | 4/15/2015 | 4/16/2015 | 4/16/2015 10:16:04 AM | A | PASS |
|
|
Tenting passed. Piping is ok to cover
|
FIR14-00765
| INSP-Sprinkler Rough-in | 4/15/2015 | 4/16/2015 | 4/16/2015 9:49:25 AM | A | PASS |
|
|
Underground supply is ok to cover
|