Inspections for the day of: Tuesday, April 16, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00555 INSP-Final Inspection4/12/20194/16/20194/16/2019 2:35:45 PMACANC
I can not find where cover, hydro or a flush has been performed for this scope of work.

Jim Baker is the contact for this final inspection. We are trying to coordinate with Crane Alarm. We are hoping for a 12:30 time slot. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00640 INSP-Final Inspection4/12/20194/16/20194/16/2019 2:35:45 PMACANC
The fire alarm permit did not get called in for inspection.

Jim Baker is the contact for this final inspection. We are trying to coordinate with Crane Alarm. We are hoping for a 12:30 time slot. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-03479 FIRE-Final Inspection4/16/20194/16/20194/16/2019 1:27:25 PMPFAIL
The contractor actually just wanted a conference. I noted that the project related fire sprinkler pemit has not been finaled and the city approved plans indicate panic hardware at the rear exit door so panic hardware may be required at the front exit door from the space. The plans indicate that hardware is to be provided if not existing but not what type of hardware. Will also need exit signs and emergency lights placed as per plans. It does not appear to be any fire alarm notification devices with-in the space. Phone #: ###-####
FIR18-00714 INSP-Final Inspection4/16/20194/16/20194/16/2019 1:17:54 PMPFAIL
Unstamped as-builts had been provided but no approved drawings or small documents have been provided. Can't perform inspection, will need to be rescheduled

Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR18-00918 INSP-Sprinkler Rough-in/Hydro4/15/20194/16/20194/16/2019 10:50:33 AMAFAIL
Overhead hydro test failed due to visible loss on guage. need plan mods due to added riser nipples, heads and sprig ups that have been added in the remote area under the mezzanine. No small documents or review notes on site. Inspection stopped.

Contact Name is Raul Munoz Phone #: ###-#### Inspection requested via web by Chris Green
FIR18-00311 INSP-Final Inspection4/15/20194/16/20194/16/2019 9:53:51 AMAPASS
Permit finaled. Previous items noted have been corrected.

Call James before you head up, he will have Nate meet you there. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD19-01128 FIRE-Final Inspection4/15/20194/16/20194/16/2019 8:31:20 AMAPASS
Life safety passed

Patrick Phone #: ###-####
FIR18-00901 INSP-Final Inspection4/11/20194/16/20194/16/2019 8:16:45 AMAFAIL
Need forward flush test and the fire alarm permit scheduled to test interconnection with fire riser devices.


Please call Jeff with time frame this will include alarm testing and our remaining items. Phone #: ###-#### Inspection requested via web by Jeff Packham
BLD17-03430 FIRE-Final Inspection4/15/20194/16/20194/16/2019 7:43:29 AMAFAIL
Repair exit discharge light on west side, provide single action hardware on west side exit door and provide annual inspection for the fire extinguisher.

Ryan Phone #: ###-#### or ###-#### Erin
BLD18-03251 FIRE-Final Inspection4/11/20194/16/20194/15/2019 1:52:36 PMACANC
I believe final plumbing, mechanical,electrical, are complete for final but can you check to make sure so i will be ready to call in final occupancy when landscape and zoning are completed. Phone #: ###-#### >> Inspection requested via web by Jimmie Miller Inspection cancelled from web by: Jimmie Miller