PLM97-00418
| INSP - Final | 4/16/1997 | 4/17/1997 | 4/17/1997 12:00:00 AM | A | PASS |
|
|
04/17/97 323 - FINAL OK
|
PLM97-01010
| INSP - Plumbing Rough-in | 4/16/1997 | 4/17/1997 | 4/17/1997 12:00:00 AM | A | PASS |
|
|
04/17/97 323 - BASIC 9 FIXTURES ROUGH-IN OK
|
PLM97-01021
| INSP - Water lines | 4/17/1997 | 4/17/1997 | 4/17/1997 12:00:00 AM | P | NR |
|
|
04/17/97 323 - READY AT 4 O'CLOCK NOT READY FOR INSPECTION -
|
PLM97-00976
| INSP - Sprinkler & Backflow | 4/17/1997 | 4/17/1997 | 4/17/1997 12:00:00 AM | P | PASS |
|
|
04/17/97 323 - SPRINKLER FINAL
|