MEC00-01074
| Rough-in | 4/14/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/14/2000 at 12:23:50. Contact: ###-####.
|
BLD99-01126
| BLD-Framing/Rough-in | 4/14/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | A | CANC |
|
|
###-#### 2nd floor framing Unable to do to many others inspections, people off. 4/18/00 10:51:42 AM
|
MEC00-00562
| Final | 4/14/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/14/2000 at 15:39:39. Contact: ###-####. 1st floor-only at this time OK for temp. occ.' 4/17/00 1:22:19 PM
|
BLD00-00243
| BLD-Framing/Rough-in | 4/14/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | A | PART |
|
|
scott ###-#### please call first All corrections made except truss blocking with A-35. Check at insullation. 4/17/00 1:23:34 PM
|
BLD00-00649
| BLD-Footing | 4/17/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 07:01:22. Contact: ###-####. Nothing at the site 4/17/00 1:23:09 PM
|
BLD00-00448
| BLD-Energy code compliance | 4/17/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 07:21:59. Contact: ###-####.
|
MEC00-00739
| Final | 4/12/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/12/2000 at 12:07:17. Contact: ###-####. 1/8" hole needed at elbow at PR valve on water heater, called several times and got busy signal. 4/17/00 1:22:59 PM
|
MEC00-00637
| Final | 4/14/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/14/2000 at 08:17:19. Contact: ###-####.
|
BLD00-00156
| BLD-Final | 4/14/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/14/2000 at 11:59:03. Contact: ###-####. Unable to do to many other inspections. 4/18/00 10:50:28 AM
|
BLD00-00768
| BLD-Footing | 4/17/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | P | CANC |
|
|
early pm ###-#### Unable to get this done, to many others. 4/18/00 10:49:30 AM
|
BLD00-00592
| BLD-Framing/Rough-in | 4/17/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | P | FAIL |
|
|
Eric, ###-#### - (stickers are back!) C/N posted 4/18/00 10:50:12 AM
|
BLD99-03310
| BLD-Conference | 4/17/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 09:33:28. Contact: ###-####. Mechanical inspector will be out of this. 4/18/00 10:50:46 AM
|
BLD00-00125
| BLD-Framing/Rough-in | 4/17/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Engineer to approve to many corrections. 4/18/00 10:50:59 AM
|
BLD00-00513
| BLD-Footing | 4/17/2000 | 4/17/2000 | 4/17/2000 12:00:00 AM | P | PART |
|
|
becky ###-#### carport Appears to be less than 3' from P/C and per plan would need to be 1hr. fire resistive const. 4/18/00 10:50:02 AM
|