Inspections for the day of: Tuesday, April 17, 2001.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-01094 Pressure Test4/14/20014/17/20014/17/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/14/2001 at 10:42:37. Contact: ###-####. locate test gage where it can be seen 4/17/2001 9:56:30 AM
MEC01-01081 Final4/16/20014/17/20014/17/2001 12:00:00 AMAPASS
fn-- harry-- ###-#### --re-insp
MEC01-01095 Final4/16/20014/17/20014/17/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/16/2001 at 15:11:51. Contact: ###-####. c/n posted 4/17/2001 12:00:30 PM
MEC01-01106 Pressure Test4/16/20014/17/20014/17/2001 12:00:00 AMPFAIL
###-#### call first need access to equipment 4/17/2001 2:15:49 PM
MEC01-01080 Rough-in4/16/20014/17/20014/17/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 04/16/2001 at 18:09:03. Contact: ###-####. need revised plans before inspection 4/17/2001 2:10:56 PM
MEC01-00526 Final4/17/20014/17/20014/17/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 04/17/2001 at 09:11:59. Contact: ###-####. sleeve gas pipe through cement 4/17/2001 2:14:54 PM
MEC01-00528 Final4/17/20014/17/20014/17/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/17/2001 at 09:12:55. Contact: ###-####.
MEC01-01105 Pressure Test4/16/20014/17/20014/17/2001 12:00:00 AMPNH
call 1st before insp-- ryan-- ###-#### pres test
MEC01-01105 Final4/16/20014/17/20014/17/2001 12:00:00 AMPNH
ryan ###-#### fn = call 1st before insp
MEC01-00632 Final4/16/20014/17/20014/17/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 04/16/2001 at 14:47:48. Contact: ###-####. c/n posted 4/17/2001 2:11:22 PM