BLD00-03611
| BLD-Final | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 10:50:00. Contact: ###-####.
|
BLD99-03148
| BLD-Framing/Rough-in | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PART |
|
|
###-####; 3rd fl. annex ok 4/17/2001 12:19:21 PM
|
BLD00-03126
| BLD-Conference | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 4/17/2001 9:27:23 AM w/ amanda
|
BLD00-03659
| BLD-Conference | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 4/17/2001 10:26:01 AM w/337, review resub. & ch. 11 UMC re refrig. piping / vessels( accumulator ) intended to be relocatd to roof...also w/ arch, Bob Howard...need add'l details for 1hr enclosure at roof & struct eng'rs review of add'l support structure, new or existing (exist masonry walls shown carrying new framing/floor/steel/ammonia vessels. Keep c/n.
|
BLD00-00514
| BLD-Conference | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 4/17/2001 9:31:26 AM keep c/n, need complete glazing, etc.
|
BLD00-03173
| BLD-Final | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | FAIL |
|
|
herb ###-####, c/n rails, firestops a bs mt lid, etc 4/17/2001 5:43:19 PM 4/17/2001 5:44:10 PM
|
BLD00-03174
| BLD-Final | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | FAIL |
|
|
herb ###-#### c/n, firestops at bsmt, rails, landscape, other finals 4/17/2001 5:48:40 PM
|
BLD00-00081
| BLD-Conference | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 4/17/2001 3:15:10 PM w/John; re prior actions on project...need call insps when placing shotcrete
|
BLD00-02175
| BLD-Conference | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 4/17/2001 5:47:05 PM w/ bldr, owner (Schotts), hvac installer, etc.re kitchen finals
|
BLD00-01092
| BLD-Footing | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | FAIL |
|
|
###-####; c/n need plans submitted for porch ftgs, justify beams, complete fireblox, etc. 4/17/2001 4:47:14 PM
|
BLD00-02752
| BLD-Other | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 07:35:42. Contact: ###-####. grid at computer rm ok, add spacer bars, obtain elec. r/i... chk at final... 4/17/2001 3:48:18 PM
|
BLD00-03538
| BLD-Concrete | 4/12/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PART |
|
|
MIKE ###-####; cols, wall ok pend report 4/17/2001 5:37:07 PM
|