PLM01-01143
| Sprinkler (Final) | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PART |
|
|
###-#### Eric underground ok 4/17/2001 10:14:46 AM
|
PLM00-04375
| Final | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 14:22:18. Contact: ###-####.
|
PLM01-01155
| Plumbing Rough-in | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-01071
| Water and/or Sewer | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PASS |
|
|
goade excavation ###-####
|
PLM00-03633
| Storm Drains | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 09:42:32. Contact: ###-####. partial grid gand h roof drain on g overflow leaks will repair and do with balance of drains on 4/18/01 4/17/2001 1:49:41 PM
|
PLM01-01143
| Sprinkler (Final) | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 352 On 4/17/2001 10:16:28 AM
|
PLM01-00223
| Med/Gas Systems | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 352 On 4/17/2001 11:49:16 AM 15# test started 11:30 04/17/01 4/17/2001 11:52:20 AM
|
PLM01-00223
| Plumbing Rough-in | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 352 On 4/17/2001 11:51:12 AM
|