BLD01-00820
| BLD-Foundation | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PART |
|
|
wall insp --ben-- ###-####
|
BLD00-03284
| BLD-Foundation | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PASS |
|
|
stem wall george-- ###-####
|
BLD00-03285
| BLD-Foundation | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PASS |
|
|
###-#### stem wall--george
|
MEC01-00427
| Final | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 15:37:00. Contact: ###-####.
|
BLD01-00791
| BLD-Footing | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PART |
|
|
###-#### appears ok work in progress,no rebar in at this time. 11/17/2001 12:06:15 PM
|
BLD00-03685
| BLD-Framing/Rough-in | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PART |
|
|
ceiling grid insp-- tim wilson ###-#### all ok except right front area with 8 " round lights centered in ceiling gride,needs wire supports.verify at next inspection. 11/17/2001 4:45:18 PM 11/17/2001 4:45:43 PM
|
BLD01-00829
| BLD-Footing | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | NR |
|
|
Randy ###-####
|
BLD01-00519
| BLD-Framing/Rough-in | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 11:21:15. Contact: ###-####.
|
BLD01-00558
| BLD-Framing/Rough-in | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 11:21:59. Contact: ###-####.
|