BLD01-00765
| BLD-Footing | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 09:58:54. Contact: ###-####.
|
MEC00-04348
| Final | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PASS |
|
|
garage code 4444\\###-####
|
BLD01-00765
| BLD-Other | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 15:31:41. Contact: ###-####. Setbacks not per plans 4/17/2001 10:30:01 AM
|
BLD00-03638
| BLD-Final | 4/16/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 15:48:18. Contact: ###-####. C. of C. #20411 issued. 4/17/2001 9:08:03 AM
|
BLD01-00338
| BLD-Framing/Rough-in | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 07:21:24. Contact: ###-####. C/N posted-ok to insulate 4/17/2001 9:43:54 AM
|
MEC01-01117
| Rough-in | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PASS |
|
|
merle ###-####
|
MEC01-01117
| Pressure Test | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PASS |
|
|
merle ###-####
|
BLD01-00827
| BLD-Footing | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PART |
|
|
jake ###-#### wip 4/17/2001 1:58:26 PM
|
MEC01-00411
| Final | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 09:39:22. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 04/17/2001 at 09:46:35.
|
BLD01-00657
| BLD-Footing | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PART |
|
|
Randy ###-#### wip 4/17/2001 3:54:29 PM
|
BLD00-03442
| BLD-Final | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | FAIL |
|
|
fn occ clyde-- ###-#### C/n issued--crawl needs debris removed and visqueen coverage throughout plus completion of rim joist insulation needed. 4/17/2001 2:41:14 PM
|
BLD00-02026
| BLD-Conference | 4/17/2001 | 4/17/2001 | 4/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 420 On 4/17/2001 3:35:40 PM Requested contractor have all subs supply "cut sheets" on product and installlation specs on fire assembly products used prior to final inspection. 4/17/2001 3:36:57 PM
|