Inspections for the day of: Wednesday, April 17, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-04162 Final4/16/20024/17/20024/17/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/16/2002 at 10:42:55. Contact: ###-####. test dcva, turn t&p down and drill drain hole prior to offsetting vertically to exterior so water wont corrode valve. 4/17/2002 9:53:14 AM
PLM02-01011 Sprinkler (Final)4/16/20024/17/20024/17/2002 12:00:00 AMAPASS
###-#### jon
PLM02-01005 Sprinkler (Final)4/16/20024/17/20024/17/2002 12:00:00 AMAPASS
###-####
PLM02-01006 Sprinkler (Final)4/16/20024/17/20024/17/2002 12:00:00 AMAPASS
###-####
PLM02-01002 Water and/or Sewer4/16/20024/17/20024/17/2002 12:00:00 AMAPASS
Scheduled by Inspector: 330 On 4/16/2002 4:56:44 PM
PLM02-00875 Final4/16/20024/17/20024/17/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/16/2002 at 17:40:36. Contact: ###-####. needs an avb upstream of the control valve on the mold grinder, Bill Thompson is going to show up to make a determination on the solvent washer this afternoon and let me know what will be required. 4/17/2002 9:27:45 AM
PLM02-00994 Water and/or Sewer4/17/20024/17/20024/17/2002 12:00:00 AMAPART
Added by Inspector: 330 On 4/17/2002 11:15:10 AM 8" to main ok will wrap joints on exterior of m.h., m.h. needs grouting
PLM01-03729 Water and/or Sewer4/17/20024/17/20024/17/2002 12:00:00 AMAPART
Added by Inspector: 330 On 4/17/2002 11:22:56 AM starting the n.w. s.d. main, east side test not ready yet
PLM02-00982 Sprinkler (Final)4/16/20024/17/20024/17/2002 12:00:00 AMPPASS
STEVE ###-####
PLM02-01016 Plumbing Rough-in4/17/20024/17/20024/17/2002 12:00:00 AMPPASS
joe- ###-#### r/i