BLD98-03705
| BLD-Footing | 4/15/2002 | 4/17/2002 | 4/17/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/15/2002 at 08:01:32. Contact: . Subject to special inspection I have not been to site this day. 4/17/2002 3:50:01 PM
|
BLD02-00411
| BLD-Framing/Rough-in | 4/15/2002 | 4/17/2002 | 4/17/2002 12:00:00 AM | A | PASS |
|
|
fr john- ###-####. interior non bearing walls ok. 4/17/2002 12:58:13 PM
|
BLD00-03729
| BLD-Framing/Rough-in | 4/16/2002 | 4/17/2002 | 4/17/2002 12:00:00 AM | A | PART |
|
|
###-#### BRUCE passage 115 east side wall ok to cover there are 2 back to back ele boxes on the west side of this (east wall)contractor notified to protect with putty pads, can be verified at next inspection. Note there is no ceiling in this corriodor at this time.and the west side wall of this passage is drywalled.17/2002 1:23:59 PM 4/17/2002 1:25:08 PM
|
BLD01-02414
| BLD-Final | 4/16/2002 | 4/17/2002 | 4/17/2002 12:00:00 AM | A | PASS |
|
|
fn pete- ###-####Apears ok ther is a new detail for the masonry wall that is stamped the engineer, dated 4/8/02. The roof structure is complete and attic is insulated. It appears ok with visual inspection of blown attic. Prior inspection history of this permit is not clear. 4/17/2002 11:53:09 AM
|
BLD01-03067
| BLD-Framing/Rough-in | 4/17/2002 | 4/17/2002 | 4/17/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/17/2002 at 07:26:55. Contact: ###-####.Partial inspection only of southend of office reodle, I have found the ceiling above corrior is not complete as pipes have not been adequately caulked and some holes will require drywall, also pillow pad at the 4 in conduit, contractor on site for inspection will recall. Note:only partial inspection. 4/17/2002 2:22:14 PM
|
BLD02-00704
| BLD-Framing/Rough-in | 4/17/2002 | 4/17/2002 | 4/17/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 407 On 4/17/2002 8:56:35 AM insulation ok. 4/17/2002 4:12:19 PM
|
BLD02-00197
| BLD-Framing/Rough-in | 4/17/2002 | 4/17/2002 | 4/17/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 407 On 4/17/2002 2:15:43 PM . Ok very little framing, door relocation is scope, also the grid ceiling has been up graded to comply with code,as wire-ties and light supports added, to entire ceiling. 4/17/2002 2:19:14 PM
|
BLD02-00397
| BLD-Final | 4/16/2002 | 4/17/2002 | 4/17/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/16/2002 at 17:13:44. Contact: ###-####. 4/17/2002 4:59:26 PM. Need to see the approve plans, to check wall and cabinet support. Called contractor. 4/17/2002 5:01:38 PM
|
MIS02-00085
| BLD-Final | 4/16/2002 | 4/17/2002 | 4/17/2002 12:00:00 AM | P | NR |
|
|
###-#### CALVIN
|
MIS02-00084
| BLD-Final | 4/16/2002 | 4/17/2002 | 4/17/2002 12:00:00 AM | P | NR |
|
|
###-#### CALVIN
|