BLD02-03103
| FIRE-Conference | 4/16/2003 | 4/17/2003 | 4/17/2003 12:00:00 AM | A | PART |
|
|
ANTHONY; Phone #: ###-#### Internet Inspection Request from: Darla Downs discussed exit signs; dorr hardware; mechanical openings and fire stopping at ceiling 4/17/2003 10:14:32 AM
|
BLD03-00464
| FIRE-Final Inspection | 4/16/2003 | 4/17/2003 | 4/17/2003 12:00:00 AM | A | PASS |
|
|
JIM ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
FIR03-00094
| INSP-Final Inspection | 4/17/2003 | 4/17/2003 | 4/17/2003 12:00:00 AM | P | PASS |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
FIR02-00311
| INSP-Sprinkler Rough-in | 4/17/2003 | 4/17/2003 | 4/17/2003 12:00:00 AM | P | PART |
|
|
ADAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs identified on plans for area okay to cover; will recheck for two retaining straps as marked on plans 4/17/2003 3:03:09 PM
|
BLD02-02112
| FIRE-Final Inspection | 4/17/2003 | 4/17/2003 | 4/17/2003 12:00:00 AM | P | PASS |
|
|
|
FIR03-00040
| INSP-Sprinkler Rough-in/Hydro | 4/7/2003 | 4/17/2003 | 4/17/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 4/7/2003 at 3:00:33 PM. Contact: ###-####. flow test okay; need gauge on south stair standpipe 4/17/2003 2:36:15 PM
|