Inspections for the day of: Monday, April 17, 2006.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-00917 BLD-Aging Inspection4/17/20064/17/20064/17/2006 4:36:29 PM NR
No respnse.
BLD04-01191 BLD-Aging Inspection4/17/20064/17/20064/17/2006 3:48:39 PM CANC
BLD04-01191 DOC - Permit Finaled4/17/20064/17/20064/17/2006 3:48:30 PMPDONE
BLD05-02066 BLD-Final4/17/20064/17/20064/17/2006 2:42:34 PMPPASS
BRIAN; Phone #: ###-#### PLEASE CALL 1/2 HR PRIOR Internet Inspection Request from: Cathy Chiles
BLD05-02066 DOC - Permit Finaled4/17/20064/17/20064/17/2006 2:42:24 PMPPASS
BLD06-00506 BLD-Final4/17/20064/17/20064/17/2006 1:27:58 PMPPASS
DAN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD06-00506 DOC - Permit Finaled4/17/20064/17/20064/17/2006 1:27:48 PMPPASS
BLD05-02117 BLD-Framing/Rough-in4/17/20064/17/20064/17/2006 1:16:04 PMPPASS
Ed; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Lateral bracing has been completed. ok to cover.
BLD05-02117 BLD-Energy code compliance4/17/20064/17/20064/17/2006 1:15:18 PMPPASS
Ed; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD05-02406 BLD-Wall cover4/16/20064/17/20064/17/2006 12:55:39 PMAPART
Internet Inspection Request from: paul thornton. Shear nailing on exterior walls.
BLD05-02409 BLD-Wall cover4/16/20064/17/20064/17/2006 12:54:37 PMAPART
Internet Inspection Request from: paul thornton. Shear nailing ok, exterior walls built with 2x4, plans call for 2x6. Also noted that plans call for 5/8 type X inside and outside exterior walls on all sides for 1hr. rating, which may not be applicable due to fire seperation distances. Contractor to contact architect to resolve issues.
BLD05-02411 BLD-Energy code compliance4/16/20064/17/20064/17/2006 12:50:01 PMAPASS
Internet Inspection Request from: paul thornton. All framing issues have been resolved.
BLD04-03025 BLD-Framing/Rough-in4/17/20064/17/20064/17/2006 11:59:26 AMAPART
Scheduled by a contractor via Hello! on 4/17/2006 at 7:14:28 AM. Contact: ###-####. 2nd floor, south wing vent shaft walls
BLD06-00565 BLD-Foundation4/15/20064/17/20064/17/2006 9:09:01 AMAPASS
Scheduled by a contractor via Hello! on 4/15/2006 at 1:41:21 PM. Contact: ###-####.
BLD04-00871 BLD-Aging Inspection4/17/20064/17/20064/17/2006 8:28:46 AM CANC
BLD04-00871 DOC - Permit Finaled4/17/20064/17/20064/17/2006 8:28:35 AMAPASS
confirmed that ele. has finaled the shell and core.