Inspections for the day of: Thursday, April 17, 2008.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE04-03088 Final4/17/20084/17/20084/18/2008 1:34:05 PMPPART
Loren, ###-#### met owner, told shall bond hot and cold water piping per nec 250.104(A) and provide disconnect for water heater per nec 422.31(B), will call back later, rest ok
ELE08-00305 Electrical Rough-In4/17/20084/17/20084/17/2008 4:28:32 PMPCANC
Scheduled by a contractor via Hello! on 4/17/2008 at 9:40:16 AM. Contact: ###-####. see ri, p/s
ELE08-00093 Final4/17/20084/17/20084/17/2008 3:11:07 PMPPASS
looked at system, ok to final
ELE08-00671 Final4/16/20084/17/20084/17/2008 3:08:30 PMPPASS
Call Clif with questions. Thany you Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa ok to final, signed occupancy card
ELE08-00952 Conference4/16/20084/17/20084/17/2008 2:14:12 PMPDONE
jack cell --call 1st before insp -- Phone #: ###-#### talked about electrical installation- all topics, when to call for rough in
ELE08-00855 Electrical Rough-In4/16/20084/17/20084/17/2008 1:41:22 PMPPASS
this is ready again , but customer wont be home till after 1:00 Phone #: ###-#### Internet Inspection Request from: gary batten ri ok, bath light by others per electrician
ELE08-00855 Final4/17/20084/17/20084/17/2008 1:40:16 PMPPASS
this is ready again , but customer wont be home till after 1:00 Phone #: ###-#### Internet Inspection Request from: gary batten ok to final
ELE07-02961 Electrical Rough-In4/17/20084/17/20084/17/2008 1:21:53 PMPNR
john Phone #: ###-#### met owner, explained make-up had to be done and 1 1/4" shall be provided for for nm cable, shall staple nm within 8" of boxes
ELE08-00305 Rough-In Permanent Service4/17/20084/17/20084/17/2008 12:33:28 PMPPASS
Scheduled by a contractor via Hello! on 4/17/2008 at 10:32:16 AM. Contact: ###-####. ri ok for warehouse walls for baths and bath hard lids, warehouse walls already ok earlier by 412, not heating up inside warehouse transformer at this time, will see later, p/s u/g n ok
ELE08-00954 Temporary Service4/16/20084/17/20084/17/2008 10:28:19 AMACANC
###-#### met contractor, see conference
ELE08-00954 Conference4/16/20084/17/20084/17/2008 10:09:54 AMADONE
Danny Phone #: ###-#### talked about how to supply service for construction trailers, inspections required and when access should be given in store, possibly having another conference after electrician meets with general contractor
ELE08-00608 Final4/17/20084/17/20084/17/2008 9:30:32 AMAPASS
This job is inside the boise airport. on your way out there please call brian with CNI and he will meet you at the construction entrance so that he can escourt you to the job with as little hassle as possible. Brian # ###-####. This is a final inspection on the remodel at the varsity grill. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean met contactor, called electrician, ok to final, signed occupancy card
ELE08-00892 Electrical Rough-In4/16/20084/17/20084/17/2008 8:34:03 AMAPASS
steve Phone #: ###-#### ric ok
ELE08-00789 Final4/16/20084/17/20084/17/2008 7:51:50 AMAPASS
Roy, reinspect; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to final
ELE08-00789 Electrical Rough-In4/17/20084/17/20084/17/2008 7:51:26 AMAPASS
Roy, reinspect; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt corrections made, ok to cover u/g