BLD08-00145
| BLD-Energy code compliance | 4/17/2008 | 4/17/2008 | 4/17/2008 4:29:18 PM | P | PASS |
|
|
troy Phone #: ###-####
|
BLD08-00144
| BLD-Energy code compliance | 4/17/2008 | 4/17/2008 | 4/17/2008 4:29:09 PM | P | PASS |
|
|
troy Phone #: ###-####
|
BLD08-00143
| BLD-Energy code compliance | 4/17/2008 | 4/17/2008 | 4/17/2008 4:29:00 PM | P | PASS |
|
|
troy Phone #: ###-####
|
BLD08-00666
| BLD-Footing | 4/16/2008 | 4/17/2008 | 4/17/2008 1:24:41 PM | P | PASS |
|
|
noah Phone #: ###-####. Perimeter footing. Fill will have to be brought in to make frost depth. (flood zone)
|
BLD08-00284
| BLD-Framing/Rough-in | 4/16/2008 | 4/17/2008 | 4/17/2008 12:01:39 PM | A | PASS |
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Interior walls on existing mezz. stair framing and vestibule.
|
BLD08-00518
| BLD-Framing/Rough-in | 4/16/2008 | 4/17/2008 | 4/17/2008 11:38:31 AM | A | FAIL |
|
|
bob Phone #: ###-####. Needs to provide straps on top plates from new to existing framing. Provide baffels in all truss bays for adequate attic insul. Still needs mech. ri insp. ok to insul. c/n posted.
|
BLD07-00077
| BLD-Framing/Rough-in | 4/16/2008 | 4/17/2008 | 4/17/2008 11:25:45 AM | A | PASS |
|
|
Ray; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. ok to insul. did post c./n notice to install baffels in every bay for adequate attic insul.
|
BLD08-00546
| BLD-Framing/Rough-in | 4/16/2008 | 4/17/2008 | 4/17/2008 11:00:33 AM | A | PASS |
|
|
steve Phone #: ###-####. TS and beam assembly for new accordian door.
|