FIR14-00108
| INSP-Final Inspection | 4/16/2014 | 4/17/2014 | 4/18/2014 10:05:11 AM | A | PASS |
|
|
Fire sprinkler permit work passed final walkthrough.
|
FIR14-00142
| INSP-Conference | 4/14/2014 | 4/17/2014 | 4/17/2014 4:44:48 PM | P | DONE |
|
|
On site conference regarding duct smoke detection for HVAC shutdown.
|
FIR14-00124
| INSP-Sprinkler Rough-in/Hydro | 4/17/2014 | 4/17/2014 | 4/17/2014 3:53:39 PM | P | PART |
|
|
Overhead hydrostatic test completed satisfactory.
|
FIR14-00196
| INSP-Sprinkler Rough-in | 4/17/2014 | 4/17/2014 | 4/17/2014 3:51:12 PM | P | PART |
|
|
UG fire supply line and stub-in approved for cover.
|
BLD13-00689
| FIRE-Final Inspection | 4/16/2014 | 4/17/2014 | 4/17/2014 2:59:08 PM | A | PART |
|
|
Inspection completed for the new office area addition 1st and 2nd floors. Noted adjustments necessary to exit signage and fire sprinkler coverage. Also completed functional fire alarm testing including occupant notification.
|
FIR13-00533
| INSP-Final Inspection | 4/16/2014 | 4/17/2014 | 4/17/2014 2:55:07 PM | A | PART |
|
|
Forrest, We would like to have this first thing in the morning if at all possible. This would be for a partial, and will involve only the inspection of the new office area, first and second floors. The existing office, and the warehouse will be at a future date.
Please call me as soon as possible, so I can have the appropriate paperwork ready for you, and can advice the contractor of an approximate time.
Thank you, Jason. ###-#### Phone #: ###-#### >> Inspection requested via web by Jason Minnick
|
FIR13-00167
| INSP-Sprinkler Rough-in | 4/16/2014 | 4/17/2014 | 4/17/2014 2:53:56 PM | A | PART |
|
|
Preliminary walkthrough of the basement level, temp standpipe, and project conditions.
|
BLD14-00750
| FIRE-Final Inspection | 4/16/2014 | 4/17/2014 | 4/17/2014 2:52:17 PM | A | PASS |
|
|
|
BLD14-00751
| FIRE-Final Inspection | 4/16/2014 | 4/17/2014 | 4/17/2014 2:51:56 PM | A | PASS |
|
|
|
BLD14-00749
| FIRE-Final Inspection | 4/16/2014 | 4/17/2014 | 4/17/2014 2:51:35 PM | A | PASS |
|
|
|
BLD14-00747
| FIRE-Final Inspection | 4/16/2014 | 4/17/2014 | 4/17/2014 2:50:38 PM | A | PASS |
|
|
|
BLD13-03257
| FIRE-Final Inspection | 4/16/2014 | 4/17/2014 | 4/17/2014 9:29:41 AM | A | PASS |
|
|
Verified remainder of work is completed. Fire life safety final approved.
|
FIR14-00121
| INSP-Sprinkler Rough-in | 4/17/2014 | 4/17/2014 | 4/17/2014 12:00:00 AM | P | CANC |
|
|
Terry Nelson Phone #: ###-#### - - terry called in and canceled and reschuled for tomorrow morning /// 4-17-14 ps
|
FIR13-00689
| INSP-Sprinkler Rough-in | 4/17/2014 | 4/17/2014 | 4/17/2014 12:00:00 AM | P | CANC |
|
|
Terry Nelson Phone #: ###-#### - - terry called in and canceled and reschuled for tomorrow morning /// 4-17-14 ps
|
FIR13-00440
| INSP-Sprinkler Rough-in | 4/17/2014 | 4/17/2014 | 4/17/2014 12:00:00 AM | P | CANC |
|
|
Terry Nelson Phone #: ###-#### - - terry called in and canceled and reschuled for tomorrow morning /// 4-17-14 ps
|