Inspections for the day of: Thursday, April 17, 2014.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS13-00076 MIS-Aging Inspection4/17/20144/17/20144/18/2014 4:25:46 PM PASS
Demo was completed and bld was finaled.
BLD11-01333 BLD-Aging Inspection4/17/20144/17/20144/18/2014 4:24:35 PM PASS
MIS13-00170 MIS-Aging Inspection4/17/20144/17/20144/18/2014 4:21:09 PM PASS
BLD14-00122 BLD-Aging Inspection4/17/20144/17/20144/18/2014 4:20:12 PM CANC
BLD14-00903 BLD-Final4/16/20144/17/20144/17/2014 4:27:22 PMPNR
Les Quinn Phone #: ###-####. Life safety inspection failed. The noted life safety that has been entered was added in error and should be for bld13-01688, treasure valley hospital.
BLD13-01688 BLD-Final4/17/20144/17/20144/17/2014 4:25:59 PMPCANC
moved to am. Life safety for the or addition has passed, but was entered in error under bld14-00903. I have contacted troy c. and left a message for him.
BLD13-01688 BLD-Final4/17/20144/17/20144/17/2014 3:39:15 PMPNR
Mark-patio cover in back Phone #: ###-####. This in regards to the patio cover that has been added to scope of work. Patio cover is complete, but the sprinkler system has not yey been extended in to the covered patio area.
GCB13-00082 GCB-Final4/17/20144/17/20144/17/2014 2:58:46 PMPPASS
Randy ###-####. Structural final ok.
MIS14-00066 BLD-Conference4/17/20144/17/20144/17/2014 2:31:55 PMPFAIL
A correction notice was issued noting that a demo permit is required prior to any further work.
BLD14-00119 BLD-Footing4/16/20144/17/20144/17/2014 2:12:25 PMPPART
Dan Phone #: ###-####. perimeter and interior footings for new east wing, work in progress. Will have special inspection.
BLD14-00632 BLD-Ceiling Grid Inspection4/16/20144/17/20144/17/2014 1:30:34 PMPPASS
Please call Kelly Driesel 30 minutes prior to inspection. Code to open door is 1359 suite 140 Phone #: ###-#### >> Inspection requested via web by Brian McCoy. Ceiling grid ok.
BLD13-01688 BLD-Final4/16/20144/17/20144/17/2014 11:36:33 AMACANC
Charles Phone #: ###-####. Moved to pm pending fire alarm.
BLD13-03523 BLD-Wall Bracing4/17/20144/17/20144/17/2014 9:19:58 AMAPASS
Upper story shear Phone #: ###-#### >> Inspection requested via web by Brian Stark. 2nd. floor shear nailing ok.
BLD13-03522 BLD-Wall Bracing4/17/20144/17/20144/17/2014 9:19:36 AMAPASS
Upper story shear. Please inspect first thing Phone #: ###-#### >> Inspection requested via web by Brian Stark. 2nd. floor shear nailing ok.
BLD13-03521 BLD-Wall Bracing4/17/20144/17/20144/17/2014 9:19:14 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Brian Stark. 2nd. floor shear nailing ok.
BLD13-03519 BLD-Wall Bracing4/17/20144/17/20144/17/2014 9:18:51 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Brian Stark. 2nd. floor shear nailing ok.