ESC14-00824
| General Inspection | 4/17/2015 | 4/17/2015 | 4/20/2015 3:30:23 PM | | PASS |
|
|
WIP at St. Al's Parkcenter Clinic. Parking lot is now paved, access to Parkcenter Blvd. is now installed/stabilized. No trackout or discharges. No corrections at this time.
|
ESC14-00515
| Site Final | 4/17/2015 | 4/17/2015 | 4/17/2015 4:05:10 PM | P | PEND |
|
|
Discussed bank stabilization with RP-GC Al. Bank will be sodded and covered with bark mulch. May need to reinforce toe of slope is dirt is undercut.
Landscaping scheduled to be complete next week.
|
ESC14-00933
| Site Final | 4/15/2015 | 4/17/2015 | 4/17/2015 3:24:50 PM | P | PASS |
|
|
Clean up of adjacent lot is still in progress. No sediment runoff or other issues. Street and gutter are clean. No corrections, not quire ready for final.
|
ESC14-00852
| General Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 3:19:28 PM | | PASS |
|
|
Permit posted. Perimeter wattles contain sediment on site. Culdesac is clean, DI has coir mat filter. Trash contained. WIP.
|
ESC14-00404
| General Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 3:03:20 PM | | PASS |
|
|
|
ESC14-00841
| General Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 1:30:13 PM | | PASS |
|
|
WIP. Landscaping and finishing touches remain. No ESC violations.
|
ESC14-01056
| Aging Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 10:56:53 AM | | PASS |
|
|
Detatched garage exterior complete. No construction acitivity. Driveway paved & yard landscaped/stabilized. Permit finaled.
|
ESC14-01056
| DOC - Permit Finaled | 4/17/2015 | 4/17/2015 | 4/17/2015 10:50:33 AM | P | PASS |
|
|
|
ESC14-00529
| General Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 10:13:28 AM | | PASS |
|
|
Construction is complete on all three structures at Beverly. The open areas have been recently seeded for grass which has started to grow. Temp BMPs (MS4 DI bags on Beverly) have been removed.
Will check back next general inspection for success of grass establishment. No corrections needed at site.
|
ESC15-00358
| Site Preparation | 4/16/2015 | 4/17/2015 | 4/17/2015 9:25:15 AM | A | NR |
|
|
Jeremy Phone #: ###-####
Site grading plans still need to be released/picked up. Work not scheduled to start till next week. RP Jeremy will call to schedule site prep
|
ESC14-01003
| Aging Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 8:53:19 AM | | PASS |
|
|
|
ESC14-01004
| Aging Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 8:45:05 AM | | PASS |
|
|
Home complete, requires landscaping. East Vally Tahoe homes to be landscaped at once. Will final after stabilization and cleanup.
|
ESC14-01005
| Aging Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 8:44:51 AM | | PASS |
|
|
Home complete, requires landscaping. East Vally Tahoe homes to be landscaped at once. Will final after stabilization and cleanup.
|