Inspections for the day of: Friday, April 17, 2015.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00824 General Inspection4/17/20154/17/20154/20/2015 3:30:23 PM PASS
WIP at St. Al's Parkcenter Clinic. Parking lot is now paved, access to Parkcenter Blvd. is now installed/stabilized. No trackout or discharges. No corrections at this time.
ESC14-00515 Site Final4/17/20154/17/20154/17/2015 4:05:10 PMPPEND
Discussed bank stabilization with RP-GC Al. Bank will be sodded and covered with bark mulch. May need to reinforce toe of slope is dirt is undercut.

Landscaping scheduled to be complete next week.
ESC14-00933 Site Final4/15/20154/17/20154/17/2015 3:24:50 PMPPASS
Clean up of adjacent lot is still in progress. No sediment runoff or other issues. Street and gutter are clean. No corrections, not quire ready for final.
ESC14-00852 General Inspection4/17/20154/17/20154/17/2015 3:19:28 PM PASS
Permit posted. Perimeter wattles contain sediment on site. Culdesac is clean, DI has coir mat filter. Trash contained. WIP.
ESC14-00404 General Inspection4/17/20154/17/20154/17/2015 3:03:20 PM PASS
ESC14-00841 General Inspection4/17/20154/17/20154/17/2015 1:30:13 PM PASS
WIP. Landscaping and finishing touches remain. No ESC violations.
ESC14-01056 Aging Inspection4/17/20154/17/20154/17/2015 10:56:53 AM PASS
Detatched garage exterior complete. No construction acitivity. Driveway paved & yard landscaped/stabilized. Permit finaled.
ESC14-01056 DOC - Permit Finaled4/17/20154/17/20154/17/2015 10:50:33 AMPPASS
ESC14-00529 General Inspection4/17/20154/17/20154/17/2015 10:13:28 AM PASS
Construction is complete on all three structures at Beverly. The open areas have been recently seeded for grass which has started to grow. Temp BMPs (MS4 DI bags on Beverly) have been removed.

Will check back next general inspection for success of grass establishment. No corrections needed at site.
ESC15-00358 Site Preparation4/16/20154/17/20154/17/2015 9:25:15 AMANR
Jeremy Phone #: ###-####

Site grading plans still need to be released/picked up. Work not scheduled to start till next week. RP Jeremy will call to schedule site prep
ESC14-01003 Aging Inspection4/17/20154/17/20154/17/2015 8:53:19 AM PASS
ESC14-01004 Aging Inspection4/17/20154/17/20154/17/2015 8:45:05 AM PASS
Home complete, requires landscaping. East Vally Tahoe homes to be landscaped at once. Will final after stabilization and cleanup.
ESC14-01005 Aging Inspection4/17/20154/17/20154/17/2015 8:44:51 AM PASS
Home complete, requires landscaping. East Vally Tahoe homes to be landscaped at once. Will final after stabilization and cleanup.